BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Terre Haute, Indiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Project Control No. 1900178, 1900193, 1900200, 1900206, 1900207, 1900209, 1900211, 1900284 Federal/State No. 1900178, 1900193, 1900200, 1900206, 1900207, 1900209, 1900211, 1900284 Location Bridge Replacement I70-000-10493 Precast Reinforced Concrete 3-sided Structure Vigo County - on I-70e Over Robinson Road, 6.01 Miles West of Us 41 (Rp 000+0083) Bridge Replacement I70-000-10493 Precast Reinforced Concrete 3-sided Structure Vigo County - on I-70w Over Robinson Road, 6.01 Miles West of Us 41 (Rp 000+0083) Bridge Deck Replacement I70-008-02343 Composite Steel Girder Vigo County - on I-70e Over Csx Rr, 1.40 Miles East of Us 41 (Rp 008+0003) Bridge Deck Replacement I70-008-02343 Composite Steel Box Girder Vigo County - on I-70w Over Csx Rr, 1.40 Miles East of Us 41 (Rp 008+0003) Bridge Deck Replacement I70-008-02343 Continuous Steel Girder Vigo County - on I-70e Over 7th St., 0.38 Miles East of Us 41 (Rp 007+0002) Bridge Deck Replacement I70-008-02343 Continuous Steel Girder Vigo County - on I-70w Over 7th Street, 0.38 Mile East of Us 41 (Rp 007+0002) Bridge Replacement I70-008-10496 Precast Reinforced Concrete 3-sided Structure Vigo County - on I-70e Over 25th Street, 2.09 Miles East of Us 41 (Rp 008+0009) Bridge Replacement Vigo County - on I-70w Over 25th Street, 2.09 Miles East of Us 41 (Rp 008+0009) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids INDOT - Call 530 Bridge Replacement - I 70

Award

Bridges / Tunnels

$29,715,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

427

15

6

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
66
Bidding Soon
859
All Active Projects
379
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 15, 2024

April 15, 2024

img_map_placeholder

I-70, Terre Haute, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.