Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Kansas City, Kansas. Completed plans call for site work for a 586,386-square-foot road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The KCKPS School District is seeking bids for concrete/asphalt repair work at various schools throughout the district.It is the intent of the Kansas City Kansas Public Schools, Kansas City, Kansas to enter into an agreement for concrete, masonry or asphalt recoat and replacement work. KCKPS reserves the right to increase or decrease the approximate amount at each site as needed. Consists of the removal and replacement of approximately 2150 SF Area of concrete stairs, ramps and sidewalks and 455 LF of concrete curbs. Asphalt work to consist of 586,386 SF of top Seal and crack filling of and parking lots and playgrounds. 2" mill patching or asphalt replacement of 28,644 sf. Traffic control and other incidental items shall be included as shown in the specifications. A dollar value unit cost must be filled in for each item indicated. Crack filling shall be included in the pricing with the top seal of lots and playgrounds. Re-striping of lots and playgrounds should be priced separately for each location as marked. All work will begin by June 5th and is to be completed prior to August 4th, 2023. Bid Security Bid Bond: Bid security shall be submitted with each bid in the amount of five percent (5%) of the bid amount. No bids may be withdrawn for a period of sixty (60) days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Payment & Performance Bond: Bidder agrees to furnish a Payment & Performance Bond, in the amount of 100% (one hundred percent) of total contract value after receipt of contract. Prevailing Wage/Union Prevailing Wage IS NOT required. There is no union labor requirement for this solicitation. Liquidated Damages Completion of this project before August 4th, 2023 is imperative. At the District's sole discretion, liquidated damages in the amount of Two-Hundred-Fifty Dollars ($250.00) per calendar day will be assessed against the Contract if the project is not completed by the date indicated. Bid Result - IARC/Argentine Middle - North Lot - R&R Concret - $ 3,910.00 Middle Catwalk Lot - R&R Concret - $ 1,380.00 Southeast Lot - R&R Concret - $ 4,070.00 Emerson - SE Lot - McConnell & Associates - $ 8,035.00 New Stanley - North Lot/Playground - R&R Concrete - $ 3,470.00 South Parking - R&R Concrete - $ 1,410.00 Noble Prentis - South Parking - R&R Concrete - $ 2,480.00 Playground - R&R Concrete - $ 5,560.00 Morse EEC - South/West Lots - R&R Concrete - $ 50,240.00 Rosedale Middle - South Parking - R&R Concrete - $ 8,930.00 T.A. Edison - North Playground - R&R Concrete - $ 7,430.00 North Parking - R&R Concrete - $ 6,320.00 Main Library - South Lot - R&R Concrete - $ 7,070.00 Eugene Ware - North Playground - McConnell & Associates - $ 7,180.00 New Chelsea - South Playground - R&R Concrete - $ 8,590.00 North Playground - R&R Concrete - $ 3,125.00 Curb to ADA ramp - R&R Concrete - $ 3,500.00 M.E. Pearson - South Playground - McConnell & Associates - $ 6,970.00 Quindaro - East Playground - McConnell & Associates - $ 13,905.00 West Drive - McConnell & Associates - $ 12,465.00 8th Street Baptist Church - South/West Parking Lots - R&R Concrete - $ 13,615.00 South Lot - R&R Concrete - $ 10,590.00 Central Office - Lower Lower South & East Lots - R&R Concrete - $ 20,265.00 Flume/Drainage Channel - R&R Concrete - $ 3,000.00 NCO Blg A & B - Curb - MTS Contracting - $ 2,900.00 Sidewalk - MTS Contracting - $ 12,000.00 Sumner Academy - Sidewalk/Ramp/Stairs - Quinn Concrete - $ 23,940.00 Eisenhower Middle - Create new curbs and ADA parking - SGI - $ 44,625.00
Bid Results
Roads / Highways
$296,975.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2023
June 5, 2023
Multiple Locations, Kansas City, KS
Related To This Project
Kansas City, KS
Bid Date: Apr 17 2023
Kansas City, KS
Bid Date: May 11 2023
Kansas City, KS
--
Kansas City, KS
--
Kansas City, KS
Bid Date: May 16 2023
Kansas City, KS
--
Kansas City, KS
Bid Date: Jun 07 2023
Kansas City, KS
--
Kansas City, KS
--
Kansas City, KS
--
Kansas City, KS
Bid Date: Apr 01 2020
Kansas City, KS
Bid Date: Apr 05 2023
Kansas City, KS
--
Kansas City, KS
--
Kansas City, KS
Bid Date: Mar 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.