BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Triangle, Virginia. Completed plans call for site work for a bridge / tunnel.

This purpose of this project is to remove five (5) existing old trail bridges and install five (5) new trail bridges on five (5) different hiking trail locations inside the park. The new trail bridges have already been purchased, assembled, and are stored at the park's maintenance facility. They need to be installed at their individual locations by the contractor as designated by the park. The contractor shall provide all labor, supervision, transportation, materials, tools, equipment, and ancillary services necessary to execute the tasks specified in this the scope of work and any of its attachments. Structural & Civil Engineering: o VA PE Stamped Design & Calculation Package for the Bridges o VA PE Stamp Design & Calculation Package for the Abutments/Anchors Bridge 1 - S. Valley Trail at Lot C Access: o Qty (1) Pedestrian Bridge o Weathering Steel Bridge o Pratt Truss Configuration o 90 PSF Live Load o PT Pin(R) Decking o Horizontal Railing o Freight to project site Our estimate below defines our full scope of work as a turn-key solution for the pedestrian bridges on the project. Bridge Brother's scope will include all structural & civil engineering associated with the bridges and foundations and issue a PE stamped design package, In addition, Bridge Brothers will handle all site construction associated with the bridges, manufacturing of the bridges, and onssts erection of the bridges. The bridge structures and all associated designs will be in adherence to AASHTQ design guide for bridge structures. See below for further breakdown of our scope of o Site Construction proposal could change based on Geotechnical Report, Site Survey, and Site Constraints o Site Grading for Bridge Footings o Geotechnical report and site survey needed (by others) o Form and Pour Bridge Foundations (Assumed no more than 6' tall) o Rip-rap, piles, dewatering and wingwails excluded Piles estimated o Backfill Bridge Foundations o *Ciear Access to both sides is required o Unload and Splice Fit-Up Bridges o Erect Bridges & Install Bridge Anchors

Post-Bid

Bridges / Tunnels

$4,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
75
Bidding Soon
1,999
All Active Projects
833
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

June 26, 2023

img_map_placeholder

18100 Park Headquarters Rd, Triangle, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.