Published August 21, 2023 at 8:00 PM

Updated January 26, 2024

Remodeling of a mixed-use development in Willows, California. Completed plans call for the remodel of a municipal facility.

The project location is 306 N. Villa Ave. Willows, CA 95988. Glenn County intends to award a construction contract which includes the furnishing of all labor, materials, equipment, transportation and services necessary for the completion of the project. A summary of the work is included below: Jane Hahn Building ADA Improvements: Work of the Contract can be summarized as follows: ADA Improvements: Interior demolition of limited existing conditions, improvement of existing public counter, ADA signage at entry, remodel of existing restrooms and office space. The existing mechanical, plumbing and electrical are to be modified as needed to accommodate new layout. Specific details included in the bid package shall further define the description of work. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized

Award

Municipal

$115,622.00

Public - County

Remodeling

16

15

2

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Forming Equipment, Drawing Equipment

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
611
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.