EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in Seattle, Washington. Completed plans call for the renovation of a municipal facility.

Project consist of installing two (2) variable air volume air handling units located on Concourse C roof to serve future tenant spaces. Demolition, roof openings, supports, curbs, roof walk pads with ramps, access, electrical and fire alarm services shall be provided to for complete installation. Air handling units components include supply fan, variable frequency drive, hot water heating coil, chilled water-cooling coil, filters, and economizer. Existing chilled water, heating water, fire sprinkler services, electrical, and fire alarm systems will be extended to air handling units. A booster pump will be provided for chilled water service. Port standard DDC control (Siemens) will be provided for air handling unit and pump controls. Terminal units with heating coils and DDC controls to be provided by future tenants. The Engineers estimate range for this project is $1,125,000 - $2,250,000. The WMBE utilization goal is 6% for this contract. Install two, new, Air Handling Units (AHU) to support the build-out of tenant spaces and new restrooms on Concourse C. These units will be in place for 5-10 years until a different project replaces and upsizes all the AHUs on the concourse. The units will connect to existing ductwork, chilled water, and heating water systems on the roof of Concourse C. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Municipal

$1,750,000.00

Public - City

Renovation

7

27

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Temporary Construction, Temporary Controls, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Operation Data, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Steep Slope Roofing, Natural Roof Coverings, Membrane Roofing, Flashing and Sheet Metal, Fire and Smoke Protection, Applied Fireproofing, Cementitious Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Windows, Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Sound, Vibration, and Seismic Control
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Vibration and Seismic Controls for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Air Pollution Control, Air Pollution Control Equipment, Cyclonic Separators, Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
1,056
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

June 26, 2023

img_map_placeholder

To Be Determined, Seattle, WA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Concourse C Temporary Air Handling Units

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.