Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fitness / recreation center in Davenport, Iowa. Completed plans call for the renovation of a 23,745-square-foot fitness / recreation center.
Davenport Community School District requests a quote to furnish labor and material for sanding and refinishing big gym and refinishing small gym at North High. Questions Deadline: 4/6/2023 12:35 PM (CT) Project includes: CONSTRUCTION: 1. Sand and finish the large gym. a. Apply two coats of oil-based sealer. (Rebounder oil or PoloPlaz World Class Seal) b. Paint game-lines to match the existing floor, painted logo inside the center circle, and four coats of oil-based finish. (PoloPlaz World Class Finish or Rebounder Gym Finish) 2. buff and recoat the small gym. a. Buffing, cleaning with neutralizer b. Apply two coats of oil-based finish (PoloPlaz World Class Finish or Rebounder Gym Finish) EXTENT OF WORK o Provide all labor, material, tools, equipment, and supervision necessary to complete the said project. o The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. o The contractor shall confirm all given information to verify the scope of work required, all dimensions, locate all utilities. Deficiencies in the specifications shall be reported to the District project leader. If discrepancies are discovered between the existing conditions and those noted on the drawings or scope of work, contractor shall immediately notify the District's project leader to confer. o Schedule and execute work to provide protection for the building and work site, preventing any damage to District property. Contractor will be responsible for any damage done to the District property. o Safety shall be the responsibility of the contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility's occupants including staff, visitors, customers and the occurrence of the general public on or near the site. o Please contact and consult with the project leader to coordinate proper timing so not to disrupt activities in work area. o Before beginning work, the contractor must secure approval from the building owner's representative for the following: o Areas permitted for personnel parking. o Access to the site. o Areas permitted for storage of materials, dumpster locations and debris. o Areas permitted for the location of cranes, hoists and chutes for loading and unloading materials to job site. o Obey the owner's requirements for personnel identification, inspection and other security measures. o Material Safety Data Sheets (MSDS) must be on location at all times during the transportation, storage and application of materials. o Interior stairs or elevators may not be used for removing debris or delivering materials without District permission. o School district dumpsters are not to be used for project debris or waste without permission. SUBMITTALS o After bid /quote is accepted and prior to starting work, the contractor shall submit the following: o Shop drawing, if necessary, showing layout details of construction and identification of materials with the manufactures warranty of product used to do the work. o Work Schedule. Prior to start of work, contractor shall provide a schedule of work hours. Deviations from this approved schedule shall be approved by district. o Project Timeline on the completion of project must include project start and completion date
Award
Fitness / Rec Centers
$30,950.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2023
May 11, 2023
To Be Determined, Davenport, IA
Related To This Project
Davenport, IA
Bid Date: Apr 13 2023
Davenport, IA
Bid Date: Apr 17 2023
Davenport, IA
Bid Date: Apr 18 2023
Davenport, IA
Bid Date: Apr 25 2023
Davenport, IA
Bid Date: Jul 29 2024
Davenport, IA
Bid Date: Apr 21 2023
Davenport, IA
Bid Date: Apr 21 2023
Davenport, IA
Bid Date: May 12 2023
Davenport, IA
Bid Date: Apr 18 2023
Davenport, IA
Bid Date: May 04 2023
Davenport, IA
Bid Date: Apr 06 2023
Davenport, IA
Bid Date: Apr 06 2023
Davenport, IA
Bid Date: Apr 03 2023
Davenport, IA
Bid Date: Apr 10 2023
Davenport, IA
Bid Date: Mar 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.