BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Pecos, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Contract One, SEQ Tolivar Extension Water Improvements Phase 1: 5,600 linear feet of new 16" PVC, C-900 DR 18 waterline with fittings, valves, restraints and fire hydrants to be constructed along the north and east side of the new Tolivar Road Extension for a distance of 8,100 LF. In the vicinity of the old landfill, the new waterline is being built along the east boundary in order to avoid penetration and then connects to the existing City 16" water main at the south boundary of the Golf Course. Note that there are two (2) points along the path that the water main will cross an Energy Transfer Gas Pipeline and these crossings must be done in the presence of an Energy Transfer Representative. Contract Two, SEQ Tolivar Extension - Sewer Improvements Phase 1: 6,600 linear feet of new 10", 12" and 15" gravity SDR 26 PVC sewer main with fiberglass reinforced manholes to be constructed along the centerline of the new Tolivar Road Extension for a distance of 9,100 LF. In the vicinity of the old landfill, the new sewer main is being built along the east boundary in order to avoid penetration and then continues westward along the County maintenance road to the golf course maintenance barn. A new sewer service is being provided for the maintenance building. The new sewer main continues for 700 LF along the centerline of the new Tolivar Road Extension and ends at the corner of the south development tract near the the south side of the new County Recreation Center. Note that there are two (2) points along the path that the sewer main will cross an Energy Transfer Gas Pipeline and these crossings must be done in the presence of an Energy Transfer Representative. Contract Three, SEQ Tolivar Extension - Roadway Improvements: 6,100 linear feet of new collector road with parallel drainage swales and culvert structures at outfall locations. The new roadway connects to existing CR 118 at the start point and then proceeds west and northwest, up and over the landfill and finally connecting to the existing south endpoint of Tolivar Road along the east side of the Airport. All street and drainage work will be done in accordance with applicable TxDOT specifications for a flexible base and hot mix asphaltic concrete roadway. The roadway swales will temporarily discharge into sedimentation ponds at the east endpoint of the project. All utility work must conform to applicable TCEQ rules and regulations and will be owned and operated by the Town of Pecos City.All roadwork must conform to applicable TXDOT rules and regulations and will be owned and operated by the Town of Pecos City. All work must conform to applicable rules and regulations of the Town of Pecos City. and Reeves County. There are three (3) contracts in Phase 1 (water, sewer and street) and contractors may bid on any single project by itself or may bid on any combination of all three (3). Note that the utility contracts for water and sewer will lead in time so they are completed ahead of the rough street grading portion of the street extension work. Methane monitoring is required for any utility or road work in the vicinity of the old inactive City landfill.

Post-Bid

Water / Sewer

$4,500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
68
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

July 3, 2023

img_map_placeholder

To Be Determined, Pecos, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.