Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Pecos, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Contract One, SEQ Tolivar Extension Water Improvements Phase 1: 5,600 linear feet of new 16" PVC, C-900 DR 18 waterline with fittings, valves, restraints and fire hydrants to be constructed along the north and east side of the new Tolivar Road Extension for a distance of 8,100 LF. In the vicinity of the old landfill, the new waterline is being built along the east boundary in order to avoid penetration and then connects to the existing City 16" water main at the south boundary of the Golf Course. Note that there are two (2) points along the path that the water main will cross an Energy Transfer Gas Pipeline and these crossings must be done in the presence of an Energy Transfer Representative. Contract Two, SEQ Tolivar Extension - Sewer Improvements Phase 1: 6,600 linear feet of new 10", 12" and 15" gravity SDR 26 PVC sewer main with fiberglass reinforced manholes to be constructed along the centerline of the new Tolivar Road Extension for a distance of 9,100 LF. In the vicinity of the old landfill, the new sewer main is being built along the east boundary in order to avoid penetration and then continues westward along the County maintenance road to the golf course maintenance barn. A new sewer service is being provided for the maintenance building. The new sewer main continues for 700 LF along the centerline of the new Tolivar Road Extension and ends at the corner of the south development tract near the the south side of the new County Recreation Center. Note that there are two (2) points along the path that the sewer main will cross an Energy Transfer Gas Pipeline and these crossings must be done in the presence of an Energy Transfer Representative. Contract Three, SEQ Tolivar Extension - Roadway Improvements: 6,100 linear feet of new collector road with parallel drainage swales and culvert structures at outfall locations. The new roadway connects to existing CR 118 at the start point and then proceeds west and northwest, up and over the landfill and finally connecting to the existing south endpoint of Tolivar Road along the east side of the Airport. All street and drainage work will be done in accordance with applicable TxDOT specifications for a flexible base and hot mix asphaltic concrete roadway. The roadway swales will temporarily discharge into sedimentation ponds at the east endpoint of the project. All utility work must conform to applicable TCEQ rules and regulations and will be owned and operated by the Town of Pecos City.All roadwork must conform to applicable TXDOT rules and regulations and will be owned and operated by the Town of Pecos City. All work must conform to applicable rules and regulations of the Town of Pecos City. and Reeves County. There are three (3) contracts in Phase 1 (water, sewer and street) and contractors may bid on any single project by itself or may bid on any combination of all three (3). Note that the utility contracts for water and sewer will lead in time so they are completed ahead of the rough street grading portion of the street extension work. Methane monitoring is required for any utility or road work in the vicinity of the old inactive City landfill.
Post-Bid
Water / Sewer
$4,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2023
July 3, 2023
To Be Determined, Pecos, TX
Related To This Project
Pecos, TX
Bid Date: May 25 2023
Pecos, TX
--
Pecos, TX
--
Pecos, TX
--
Pecos, TX
--
Pecos, TX
Bid Date: Jun 01 2023
Pecos, TX
Bid Date: Jun 01 2023
Pecos, TX
Bid Date: Jun 29 2023
Pecos, TX
Bid Date: Apr 06 2023
Pecos, TX
Bid Date: Mar 22 2023
Pecos, TX
Bid Date: Mar 22 2023
Pecos, TX
Bid Date: Mar 17 2023
Pecos, TX
Bid Date: Mar 30 2023
Pecos, TX
Bid Date: Sep 12 2023
Pecos, TX
Bid Date: Dec 22 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.