Site work and paving for a civil project in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Work. The Work shall include all labor and equipment necessary to install storm sewer main along the easement adjacent to 7324 Harold Avenue. Work will include but is not limited to removal of bituminous pavement, subgrade preparation, core drilling into existing reinforced concrete storm pipe, installation of pipe bedding material, reinforced concrete storm pipe, bituminous pavement, concrete curb and gutter, and restoration. 2. Schedule. Contractor shall begin the Work within one week of execution of the contract, no later than May 1, 2023, and complete all Work by July 1, 2023. Contractor shall have 30 working days from start of Work to substantial completion as defined by the reopening of the street with pavement installed and functionality of the new sanitary sewer main. Without limiting the foregoing, if a conflict arises with existing private utilities during the commencement or performance of the Work, Contractor shall proceed to work in areas without such conflict until the conflicts are resolved. It is the express understanding of the parties with regard to all Work that Contractor will undertake its performance in a manner to avoid or minimize any delays that may result from private utility conflicts or any other possible causes of delay. 3. Location. The Location Map herein Exhibit A identifies the location of the Work. The Work. Contractor shall perform the work more fully described in the attached Exhibit A (the "Work"). The Work includes all work and services required by this Agreement, whether completed or partially completed, and includes all labor, materials, equipment, and services provided or to be provided by Contractor to fulfill Contractor's obligations. All Work shall be completed according to the specifications set forth in the attached Exhibit B. Contractor shall at all times keep the premises free from accumulation of waste materials and debris caused by Contractor's operations. 2. Time for Completion. The Contractor shall proceed diligently and shall complete the Work to the satisfaction and approval of the City's authorized agent according to the deadlines set forth in Exhibit A (the "Contract Time"). Contractor shall notify the City in writing of any cause of delay of the Work within 24 hours after such cause of delay arises. If Contractor fails to complete the Work by the Contract Time, the City may immediately, or at any time thereafter, proceed to complete the Work at the Contractor's expense. If Contractor gives written notice of a delay over which Contractor has no control, the City may, at its discretion, extend the Contract Time. 3. Consideration. In consideration of the performance of the Work, the City shall pay to Contractor the amount set forth herein Exhibit D (the "Contract Price"). The consideration shall be for both the Work performed by Contractor and the expenses incurred by Contractor in performing the Work. Contractor shall submit statements to the City containing a detailed list of project labor and hours, rates, titles, and amounts undertaken by Contractor during the relevant billing period. The City shall pay Contractor within thirty (30) days after receiving a statement from Contractor.
Bid Results
Roads / Highways
$42,549.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2023
May 1, 2023
Harold Ave, Golden Valley, MN
Related To This Project
Golden Valley, MN
Bid Date: Apr 07 2023
Golden Valley, MN
Bid Date: Apr 07 2023
Golden Valley, MN
Bid Date: Apr 13 2023
Golden Valley, MN
Bid Date: Apr 26 2023
Golden Valley, MN
Bid Date: Jun 05 2023
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Jun 20 2023
Golden Valley, MN
Bid Date: Jul 12 2023
Golden Valley, MN
--
Golden Valley, MN
Bid Date: Apr 17 2023
Golden Valley, MN
Bid Date: Mar 23 2023
Golden Valley, MN
Bid Date: Mar 13 2023
Golden Valley, MN
Bid Date: Mar 28 2023
Golden Valley, MN
Bid Date: Feb 24 2023
Golden Valley, MN
Bid Date: Feb 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.