BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Golden Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Work. The Work shall include all labor and equipment necessary to install storm sewer main along the easement adjacent to 7324 Harold Avenue. Work will include but is not limited to removal of bituminous pavement, subgrade preparation, core drilling into existing reinforced concrete storm pipe, installation of pipe bedding material, reinforced concrete storm pipe, bituminous pavement, concrete curb and gutter, and restoration. 2. Schedule. Contractor shall begin the Work within one week of execution of the contract, no later than May 1, 2023, and complete all Work by July 1, 2023. Contractor shall have 30 working days from start of Work to substantial completion as defined by the reopening of the street with pavement installed and functionality of the new sanitary sewer main. Without limiting the foregoing, if a conflict arises with existing private utilities during the commencement or performance of the Work, Contractor shall proceed to work in areas without such conflict until the conflicts are resolved. It is the express understanding of the parties with regard to all Work that Contractor will undertake its performance in a manner to avoid or minimize any delays that may result from private utility conflicts or any other possible causes of delay. 3. Location. The Location Map herein Exhibit A identifies the location of the Work. The Work. Contractor shall perform the work more fully described in the attached Exhibit A (the "Work"). The Work includes all work and services required by this Agreement, whether completed or partially completed, and includes all labor, materials, equipment, and services provided or to be provided by Contractor to fulfill Contractor's obligations. All Work shall be completed according to the specifications set forth in the attached Exhibit B. Contractor shall at all times keep the premises free from accumulation of waste materials and debris caused by Contractor's operations. 2. Time for Completion. The Contractor shall proceed diligently and shall complete the Work to the satisfaction and approval of the City's authorized agent according to the deadlines set forth in Exhibit A (the "Contract Time"). Contractor shall notify the City in writing of any cause of delay of the Work within 24 hours after such cause of delay arises. If Contractor fails to complete the Work by the Contract Time, the City may immediately, or at any time thereafter, proceed to complete the Work at the Contractor's expense. If Contractor gives written notice of a delay over which Contractor has no control, the City may, at its discretion, extend the Contract Time. 3. Consideration. In consideration of the performance of the Work, the City shall pay to Contractor the amount set forth herein Exhibit D (the "Contract Price"). The consideration shall be for both the Work performed by Contractor and the expenses incurred by Contractor in performing the Work. Contractor shall submit statements to the City containing a detailed list of project labor and hours, rates, titles, and amounts undertaken by Contractor during the relevant billing period. The City shall pay Contractor within thirty (30) days after receiving a statement from Contractor.

Bid Results

Roads / Highways

$42,549.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
47
Bidding Soon
794
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

May 1, 2023

img_map_placeholder

Harold Ave, Golden Valley, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.