BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Asbestos abatement for a municipal facility in Alva, Oklahoma. Completed plans call for asbestos abatement for a municipal facility.

The Woods County Courthouse anticipates a project to remove asbestos from several areas within the courthouse building associated with the supply and return lines from the abandoned boiler system, domestic water supply and HVAC duct insulation. This work will require the removal to be completed in several phases with minimal disruption to the building occupants. Basement Boiler Room: All HVAC duct work, boiler insulation and water line insulation will be removed from this area. Estimated amounts are 304 square foot of boiler material, approximately 360 linear feet of pipe insulation and approximately 580 asbestos duct tape. Basement Storage Area: All the pipe insulation in this area is to be removed. Any HVAC duct insulation will remain in place. There is an estimated 11 72 linear feet of material in this area. First Floor: Abatement of this floor will include removal of all domestic water pipe insulation (-756 linear feet), remove approximately 100 linear feet of steam line insulation and 160 linear feet of HVAC duct insulation. Second Floor: Removal of-70 linear feet of pipe TSI from various areas on this floor. Third Floor: Approximately 60 linear feet of TSI from this area. Note: This area serves as the county jail facility. The county will need to displace the prisoners during all abatement activities. Therefore, the abatement in this area will need to be completed as quickly as possible.

Award

Municipal

$108,590.00

Public - County

Asbestos Abatement

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
8
Bidding Soon
119
All Active Projects
61
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2023

May 15, 2023

img_map_placeholder

407 Government St, Alva, OK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.