Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Eddy Township, Minnesota. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

On Leon Township Road L-33 (490th Street), 1 mile North and 2.5 miles East of Clearbrook Remove existing Bridge L1669 and replace with 16 x 7 RC Box Culvert Class 1 - 36 Linear Feet of pipe, Granular Backfill - 825 Cubic Yards, Aggregate Surfacing class 1 -120 Tons & Turf establishment lump sum. Work shall be completed by November 15, 2023. Project Start Date:04/18/2023 Construction Start Date:06/16/2023 Construction End Date:11/15/2023 Work Type:Bridge Project Type:Bridges Highest Funding Level:Local DBE Project:No

Final Planning

Bridges / Tunnels

$400,000.00

Public - County

Paving, Site Work

11

7

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
12
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

December 8, 2023

Project location map

490th st, Eddy Township, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed