Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 16, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a civil project in Bangor, Wisconsin. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of June 16, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Perpetuation project of 0.19 miles to rehabilitate structures B-29-0027 and B-29-0028 in Juneau County. The structures will have concrete deck overlays. The project also includes bridge pier, pier jacket, and abutment concrete surface repairs; mill and overlay for the bridge approaches and the area in between the bridges; and guardrail replacement. Anticipated Construction Cost: $500,000-$749,999 Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Rehabilitation - Structure Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Roads / Highways
$750,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2024
I-90, Bangor, WI
Related To This Project
Bangor, WI
Bid Date: Jan 04 2024
Bangor, WI
--
Bangor, WI
Bid Date: May 13 2025
Bangor, WI
Bid Date: Nov 12 2024
Bangor, WI
--
Bangor, WI
Bid Date: Nov 03 2021
Bangor, WI
Bid Date: Aug 09 2022
Bangor, WI
Bid Date: Jul 18 2022
Bangor, WI
Bid Date: Oct 06 2022
Antigo, WI
Bid Date: Apr 27 2023
Sheboygan, WI
Bid Date: Apr 12 2023
Marinette, WI
Bid Date: Apr 10 2023
Kenosha, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
