Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Bangor, Wisconsin. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of June 16, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Perpetuation project of 0.19 miles to rehabilitate structures B-29-0027 and B-29-0028 in Juneau County. The structures will have concrete deck overlays. The project also includes bridge pier, pier jacket, and abutment concrete surface repairs; mill and overlay for the bridge approaches and the area in between the bridges; and guardrail replacement. Anticipated Construction Cost: $500,000-$749,999 Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Rehabilitation - Structure Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Roads / Highways
$750,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2024
I-90, Bangor, WI
Related To This Project
Bangor, WI
Bid Date: Jan 04 2024
Bangor, WI
--
Bangor, WI
--
Bangor, WI
Bid Date: Apr 06 2021
Bangor, WI
Bid Date: Nov 12 2024
Bangor, WI
Bid Date: Aug 09 2022
Bangor, WI
Bid Date: Jul 18 2022
Bangor, WI
Bid Date: Oct 06 2022
Antigo, WI
Bid Date: Apr 27 2023
Sheboygan, WI
Bid Date: Apr 12 2023
Marinette, WI
Bid Date: Apr 10 2023
Kenosha, WI
--
Eau Claire, WI
Bid Date: Apr 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.