Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 30, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in North Baltimore, Ohio. Contact the soliciting agency for additional information.

Water Main Replacement Project for the Village of North Baltimore, N. Main, Broadway, W. State, W. Water, S. Main, and I-75 Water Main Scope-of-work: the Engineer Shall Furnish a Contract Administrator, a Resident Project Representative, Assistants and Other Field Staff to Assist the Engineer in Observing Performance of the Work of Contractor. This Assumes That Construction Will Occur Within a 74 Week Timeframe and Will Require the Distributed Efforts of the Staff Shown Therein. Services Shall Be Estimated Based Upon This Timeline. Some of the Requested Services Are Listed Herein but Are Not Limited to: Record Documents, Site Agent Work, Schedule Progress, Attend Meetings With the Contractor and Village Administration, Act as Liaison With the Contractor and Village Staff, Record Shop Drawings, Review of Contractor Work, Rejection of Defective Work, Inspections & Tests, Interpretation of Contract Documents, Modifications, Records Management, Reports, Payment Requests, Certificates, Maintenance and Operation Manuals and More.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
118
Bidding Soon
1,751
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

Project location map

Multiple Locations, North Baltimore, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed