EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Sunol, California. Completed plans call for site work for a water / sewer project.

In order to be an eligible bidder, please contact the city of Pleasanton and request to be added the the plan holder list. See Notice to Bidders for more information.** Hopyard and Owens Intersection: The replacement of approximately 115 linear feet of 12-inch water main across Hopyard Road just south of the intersection with Owens Drive and installation of new isolation valve clusters. The work will require extensive traffic control and to be completed at night. Isolation valves installations shall be completed by June 19, 2023. Kilkare Road and Wisteria Trail (Sunol, CA): The replacement of approximately 25 linear feet of 6-inch welded steel pipe with 6-inch ductile iron pipe across the bridge crossing at Wisteria Trail and Kilkare Road. The work will include custom pipe support fabrication and work with limited working area. A site visit prior to bid is highly recommended. Additionally, the work will consist of but is not limited to, all work associated with the removal and replacement of water lines including asbestos pipe, excavating existing roadway, concrete driveway, traffic control, and installation of fittings, piping, valving upgrades, cathodic protection, utility coordination and roadway restoration, complete in-place, in conformance with the plans and specifications and all within the City of Pleasanton.

Award

Water / Sewer

$334,084.00

Public - City

Site Work

10

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Trenching, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
88
Bidding Soon
2,052
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

img_map_placeholder

Multiple Locations, Sunol, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.