Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Park Forest, Illinois. Completed plans call for site work for a water / sewer project.
Tank Information: The structure is a 500,000 gallon spheroid elevated water storage tank with an estimated high-water level of 115 ft. located at 375 Indianwood Boulevard in Park Forest, Illinois. The work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Wet Interior - Alternate: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system. Cathodic Protection: Repair/replace the wet interior components of the cathodic protection system. Mixer: Install a mechanical mixer. Catch Basin: Install a concrete catch basin at the overflow pipe discharge. Repairs: Replace the riser manway gaskets. Overflow discharge modification. Install a fall prevention device on the wet interior ladder. Install a swing gate at the roof step-off platform opening. Install bowl rigging couplings. Remove abandoned lights on the struts. Remove the pressure sensor on the riser. Remove the inner painter's railing. Install painter's railing stand-offs on the outer painter's railing. Balcony drain holes. Balcony access modification. MISCELLANEOUS Due to supply chain issues, the Owner reserves the right to require that the Contractor is to have all of the required coating for the project delivered to the site or to the Owner's storage facility prior to the tank being taken out-of-service and commencement of the project. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders, and if applicable Supplemental Instructions to Bidders, that are included in the Bidding Requirements. Note l: The Engineer assumes no responsibility to supply Builders Exchanges and similar plan review rooms with all addenda issued. An attempt will be made to do so; however, only registered plan holders will be notified by email of expected or late term addendum with short preparation times. Note 2: Prequalification of BIDDERS - Dixon Engineering will review qualifications of all Contractors and determine their status. Contractors will be prequalified for different sized tanks and towers based on experience, workmanship, successful Project completions with DIXON and Contractor's financial data. Prequalification protocol is in the Instructions to Bidders. Any Contractor who has any projects in dispute or unfinished because of Contract problems will be considered NOT prequalified. Disqualification will result in the return of any handling fee for Bidding Documents. This contract is subject to prevailing wage requirements. No less than the prevailing wage as determined by the Illinois Department of Labor shall be paid to any worker performing work under this contract. Bidder is to submit all questions about the meaning or intent of the Bidding Documents to DIXON in writing. Contact information and submittal procedures for such questions are to be made to the Issuing Office.
Award
Water / Sewer
$433,500.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
July 10, 2023
375 Indianwood Blvd, Park Forest, IL
Related To This Project
Park Forest, IL
--
Park Forest, IL
Bid Date: Apr 18 2023
Park Forest, IL
--
Park Forest, IL
Bid Date: May 08 2023
Park Forest, IL
Bid Date: May 12 2023
Park Forest, IL
Bid Date: May 31 2023
Park Forest, IL
Bid Date: May 31 2023
Park Forest, IL
Bid Date: May 31 2023
Park Forest, IL
Bid Date: Mar 23 2023
Park Forest, IL
Bid Date: Mar 23 2023
Park Forest, IL
Bid Date: Mar 23 2023
Park Forest, IL
Bid Date: Mar 01 2023
Park Forest, IL
Bid Date: Feb 21 2023
Park Forest, IL
Bid Date: Mar 03 2023
Park Forest, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.