Renovation of a power facility in Akiachak, Alaska. Completed plans call for the renovation of a power facility.
Renovation of an existing powerhouse, including installation of engine generators, radiators, coolers, and associated equipment. The Engineer's Estimate is between $1,000,000 and $2,000,000 Description - This EPA and State appropriation funded contract is for the replacement of diesel engine-generators and related improvements to the existing diesel power plant in the community of Akiachak, Alaska, as described herein and shown in the Drawings. The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, quality control, and supplies required to complete the work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. Remove three existing diesel engine-generator sets (gensets) and associated mechanical and electrical systems as indicated in the Drawings. Take care to avoid damage to existing systems not being demolished and to equipment being salvaged. B. Render two existing engine blocks taken out of service unusable by cutting a minimum 3"x3" hole in engine crank case. Fill out a certificate of destruction for each engine and include photographic documentation of the hole and the associated engine nameplate. Note that one of the existing engine blocks taken out of service does not require a certificate of destruction. C. Demolish two existing charge air coolers and other mechanical and electrical items in the plant as indicated in the Drawings. D. Install three new Owner Furnished diesel engine powered gensets. Provide all ancillary equipment and mechanical and electrical connections as indicated in the Drawings. E. Install two new Owner Furnished charge air coolers. Provide all ancillary equipment and mechanical and electrical connections as indicated in the Drawings. F. Modify existing and install new mechanical and electrical systems in the plant as indicated in the Drawings. G. Make limited changes to the existing switchgear as indicated in the Drawings. H. Upon substantial completion acceptance, the Authority will functionally test and commission the system. The Contractor shall support the Authority during testing. Support shall include but not limited to: 1. Provide technicians on site who are familiar with the mechanical and electrical systems to assist with testing and to make corrections to any deficiencies found in the Work. I. Tasks performed by the Authority will include but not be limited to: 1. A complete functional test of the new gensets and associated controls including manual start/stop and safety shut downs. 2. Functional test of all associated systems. 3. Demonstration of system functions and operations to local power plant operators. J. Upon completion of commissioning clean up the jobsite, remove and dispose of al trash and debris, turn over all salvaged materials to the Owner as indicated in the Drawings, and remove all Contractor tools and equipment from the project site. ADDITIVE ALTERNATE #1 (GEN #1 REPLACEMENT) DESCRIPTION OF WORK A. Remove one existing diesel engine-generator set (genset) and associated mechanical and electrical systems as indicated in the Drawings. Take care to avoid damage to existing systems not being demolished and to equipment being salvaged. Note that this engine block does not require a certificate of destruction. B. Demolish other mechanical and electrical items in the plant as indicated in the Drawings. C. Install new Owner Furnished diesel engine powered genset. Provide all ancillary equipment and mechanical and electrical connections as indicated in the Drawings. D. Modify existing and install new mechanical and electrical systems in the plant as indicated in the Drawings. E. Make limited changes to the existing switchgear as indicated in the Drawings. F. Support the Authority during testing ADDITIVE ALTERNATE #2 (RADIATOR REPLACEMENT) DESCRIPTION OF WORK A. Demolish two existing glycol radiators and associated piping and electrical as indicated in the Drawings. B. Install two new Owner Furnished glycol radiators. Provide all ancillary equipment as indicated in the Drawings. C. Modify existing piping and electrical as indicated in the Drawings. ADDITIVE ALTERNATE #3 (VFD REPLACEMENT) DESCRIPTION OF WORK A. Demolish seven existing variable frequency drives (VFD) and associated controls and wiring as indicated in the Drawings. B. Provide seven new variable frequency drives (VFD) and associated controls and wiring as indicated in the Drawings. C. Program, test, and commission all variable frequency drives. ADDITIVE ALTERNATE #4 (FIRE DETECTION & ALARM) DESCRIPTION OF WORK A. Demolish existing fire alarm panel and devices as indicated in the Drawings. B. Provide new fire alarm panel and devices as indicated in the Drawings. C. Provide new wiring and raceways as required and indicated in the Drawings. D. Program, test, and commission the fire detection and alarm system. E. Train local power plant operators on system operation and maintenance. ADDITIVE ALTERNATE #5 (FIRE SUPPRESSION) DESCRIPTION OF WORK A. Provide new water mist fire suppression system as indicated in the Drawings. B. Provide new wiring and raceways as required and indicated in the Drawings. C. Program, test, and commission the fire suppression system. D. Train local power plant operators on system operation and maintenance.
Award
Power Plant
$654,311.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
June 19, 2023
To Be Determined, Akiachak, AK
Related To This Project
Fairbanks, AK
Bid Date: Apr 04 2023
Napaskiak, AK
Bid Date: May 10 2023
Palmer, AK
Bid Date: Apr 06 2023
Chignik, AK
Bid Date: Apr 14 2023
Eielson AFB, AK
Bid Date: Jun 05 2023
Fairbanks, AK
Bid Date: Apr 12 2023
Fairbanks, AK
Bid Date: Apr 14 2023
Eielson AFB, AK
Bid Date: Nov 28 2018
Anchorage, AK
Bid Date: Apr 27 2020
Juneau, AK
--
Anchorage, AK
Bid Date: Jul 27 2021
Anchorage, AK
Bid Date: Feb 28 2019
Anchorage, AK
Bid Date: Mar 22 2019
Juneau, AK
Bid Date: Jul 16 2019
Eagle River, AK
Bid Date: Jul 28 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.