BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Neoga, Illinois. Completed plans call for the renovation of a educational facility.

Bids Neoga Community Unit School District #3, Neoga, Illinois will receive bids for the project captioned below. The project consists of renovating the Jr/Sr. High School science labs, media center, restrooms, and corridors. This work includes masonry & stud walls, flooring, painting, ceilings, casework, plumbing, mechanical, and electrical. This project also includes exterior improvements to the Elementary School. This work includes tearing off approximately 49,200 square feet of an existing EPDM roof system to the deck below, and replacing with new fully adhered EPDM roofing system over cover board, over insulation. Additionally, the precast wall panels will be repainted, sealant will be replaced, and metal wall panels will be added. Prevailing wages in accordance with Cumberland County is required. Bid security is required, in the form of a bid bond or certified check in an amount equal to ten percent (10%) of the base bid as guarantee that the bid will not be withdrawn within 30 days after the date of opening of bids, and that the successful bidder will enter into a Contract for the work awarded to them. Bid security shall be made payable to Neoga CUSD #3. Bonds are required: Both a Performance Bond and a Labor and Payment Bond are required for this project, each in an amount equal to 100% of the contract price. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Award of a contract is anticipated to occur at the April 2023 meeting of the Board of Education. Begin construction on Monday, May 22, 2023. The Work shall be Substantially Complete on or before September 29, 2023. All official notifications, meeting minutes, addenda, if any, and other Bidding Documents will be offered only through website. Neoga Community Unit School District #3 Kevin Haarman, Superintendent khaarman@neogacusd3.net 217-775-6049 END 00 11 13

Post-Bid

Educational

$333,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
21
Bidding Soon
390
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 22, 2023

img_map_placeholder

790 E 7th St, Neoga, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.