Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Neoga, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of August 22, 2022, an engineer has been selected and this project is in the design development phase. It is anticipated bidding will commence mid 2024 and construction starting late summer 2024. *The closed solicitation has been included below for reference: This project may contain Federal Funds. This project requires 18% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on April 30, 2020 at 10:00 AM at the Region Five/District Nine office in Carbondale. Phase I and II Engineering Services are required to perform work associated for the reconstruction of the I-57/64 Interchange at IL 15 in Mt. Vernon, Jefferson County. The interchange type has yet to be determined. Phase I is expected to include the preparation of a Combined Design Report and Environmental Assessment (anticipated to be a Federal Approved CE), interchange geometrics layout, vertical and horizontal alignments, a Traffic Management Plan (TMP), preparation of Type, Size and Location (TS&L) plans for the bridge replacement (SN 041-0025) and retaining walls, location/drainage study, environmental impacts and coordination, data collection, an Interchange Design Study (IDS), noise study/report, cost estimates, crash analysis, pavement design, typical sections, pickup survey as needed, SUE investigation/coordination, utility conflicts and relocations, roadway geotechnical studies and the preparation of Structure Geotechnical Report (SGR) and geotechnical reports as needed. Public Involvement is expected to include (but not be limited to) a public meeting, stakeholder and agency coordination, and the preparation of exhibits and all other materials for these meetings and coordination with the City of Mt. Vernon, resource agencies and/or special interest groups. Phase II is expected to include preparation of contract plans, quantities, specifications and cost estimates. Included will be final bridge plans, retaining wall plans, roadway plans including bicycle accommodation and full ADA compliance as needed, typical sections, drainage & utility plans, erosion control plans, pavement marking plans, cross sections, lighting plans, traffic signal plans, signing plans, detailed staging plans and special details. Phase II will also include any ongoing environmental coordination as needed.This project is anticipated to be completed using PowerGeopak V8i Select Series 4 utilizing Corridor Modeling and shall be compatible with the IDOT Computer Aided Design, Drafting, Modeling, and Deliverables Manual for preparation of roadway and structure plans. The department will furnish traffic and crash data, existing right-of-way plans, inspection results, Bridge Condition Report (BCR), available structure boring information, Interchange Type Study (ITS), field survey including alignments and available as-built/existing construction plans. The current estimated construction cost for this project is $45,000,000. The completion date for this contract will be 60 months after authorization to proceed. A planned Supplement for Phase II will be done near the completion of Phase I. Statements of Interest including resumes of the key people noted above must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS) Questions concerning this Bulletin should be directed to: E- mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 63 - RFQ Engineering - RFQ Engineering - I-57/64 Interchange at IL 15, Phase I/II Engineering Services
Design
Bridges / Tunnels
$45,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2024
I-57, Neoga, IL
Related To This Project
Neoga, IL
Bid Date: Feb 08 2023
Neoga, IL
Bid Date: Feb 23 2023
Neoga, IL
Bid Date: Apr 28 2023
Neoga, IL
Bid Date: Apr 04 2023
Neoga, IL
Bid Date: Jun 26 2023
Neoga, IL
Bid Date: Oct 10 2023
Neoga, IL
Bid Date: Nov 17 2023
Neoga, IL
Bid Date: Nov 20 2023
Neoga, IL
Bid Date: Mar 11 2022
Neoga, IL
Bid Date: Feb 18 2021
Neoga, IL
Bid Date: Apr 14 2022
Neoga, IL
Bid Date: Apr 19 2022
Elgin, IL
Bid Date: Jul 26 2022
Crystal Lake, IL
Bid Date: Jul 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.