BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2023 at 8:00 PM

Updated May 30, 2024

Site work and asbestos abatement for an educational facility in West Hartford, Connecticut. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

The Town of West Hartford is seeking a contractor to supply all labor, materials, equipment, services, insurance (with specific coverage for work on asbestos), and incidentals which are necessary or required to perform the work in accordance with applicable governmental regulations and these specifications for the removal of carpet, floor tiles and vinyl stripping and installation of new flooring in the King Philip Middle School (KPMS) as specified totaling approximately 20,000 SF.

Award

Educational

$289,000.00

Public - City

Asbestos Abatement, Site Work

8

10

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
932
Active Projects
502
Bidding Soon
7,100
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

May 25, 2023

Project location map

100 King Philip Dr, West Hartford, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.