Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Allison, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.
This project consists of street repairs at various locations in town. This consists of approximately 5,856 tons of HMA pavement, 6,974 tons of granular subbase, pavement removal, geogrid, manhole adjustment,\ valve box adjustment and other related work to complete this project. This work is shown in detail on the construction plans on file with the city clerk. Funding for the project is by cash on hand from the City's budget and possibly bonds as may be required. There are no State or Federal monies or grant funds involved. There are no MBE, WBE or SBE requirements. Davis-Bacon provisions do not apply. The City reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed forty (40) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder based on the amount of work and type of materials selected by the City for Division 1, Division 2, Division 3, or any combination thereof. Time is of the essence for this project. Therefore, liquidated damages in the amount of $500 per calendar day will be assessed for each day that work remains substantially uncompleted for the entire project after the deadline set below. Contractor may begin work within ten days of the Owner's Notice to Proceed, and all work within the Right of Way shall proceed continuously until completed. Work for Division 1 must be completed by August 1, 2023 and Work for Divisions 2 and 3 must be completed by October 1, 2023. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operation of the Contractor. In addition, the bond shall guarantee against defects in materials or workmanship for a period of two years after completion and acceptance by the City. DIVISION 1 - Blacktop Service Company - $346032 DIVISION 2 - Blacktop Service Company - $261240 DIVISION 3 - Blacktop Service Company - $309465
Bid Results
Roads / Highways
$916,737.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2023
June 7, 2023
Multiple Locations, Allison, IA
Related To This Project
Allison, IA
Bid Date: Sep 21 2023
Allison, IA
Bid Date: Sep 21 2023
Allison, IA
Bid Date: Jan 19 2022
Allison, IA
Bid Date: Jan 19 2022
Allison, IA
Bid Date: Jan 27 2022
Allison, IA
Bid Date: Mar 19 2024
Allison, IA
Bid Date: Jun 28 2024
Allison, IA
--
Allison, IA
Bid Date: Mar 21 2023
Allison, IA
Bid Date: Dec 06 2022
Allison, IA
Bid Date: Jan 18 2023
Allison, IA
Bid Date: Jan 18 2023
Allison, IA
Bid Date: Sep 20 2022
Allison, IA
Bid Date: Sep 06 2022
Allison, IA
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.