BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2024 at 8:00 PM

Updated September 14, 2024

Site work for a water / sewer project in Foster City, California. Completed plans call for site work for a water / sewer project.

The Work shall include the following modifications, replacements and improvements: o Installation of a new isolation knife gate valve on the manifold; o Relocation of existing manifold bypass knife gate valve assembly; o Demolition of the existing downstream vaults and associated equipment contained therein; o Construction of a new bypass vault including valves and associated fittings, construction of a new flow meter vault with associated fittings; o Demolishing and disposal of existing segment of bypass line and associated vaults, construction of a permanent underground bypass line; o Connection of new flowmeter to the control room; o Replacement of existing anode stations with three new anode stations; o Leak test and hydrostatic pressure test of the new components and sub-systems; o Field calibration of flowmeter; o Final testing and commissioning of the project as a fully functional and operational system; o Cleanup and restoration of the construction work area within the LS59 yard construction zone. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document Question Deadline 09/03/2024 at 5:00 PM PT

Award

Water / Sewer

$1,400,000.00

Public - City

Site Work

13

22

37

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
206
Bidding Soon
3,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

November 11, 2024

Project location map

100 Lincoln Centre Dr, Foster City, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.