BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2023 at 8:00 PM

Updated July 22, 2025

Site work for a bridge / tunnel in Boise, Idaho. Completed plans call for site work for a bridge / tunnel.

Replace two corrugated metal pipes with a precast stiff leg bridge, roadway asphalt, dewatering, cast-in-place concrete, construct curb, gutter, and sidewalk on both sides of the street, a valley gutter, pedestrian ramps, and install pedestrian railings. Question Submission Deadline: April 10, 2023, 12:00pm, Question Response Deadline: April 11, 2023, 4:30pm.The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD.

Bid Results

Bridges / Tunnels

$741,005.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
35
Bidding Soon
322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

June 12, 2023

Project location map

E Mallard Dr, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.