Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work and paving for a road / highway in Beaumont, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
District/ Division : Beaumont County (Controlling Project) : Jefferson Let Type : Statewide Let - CST Highway (ccsj) : US 90 Type of work (controlling project) : Rehabilitate Existing Roadway Bidder pre-qualification waiver : No Limit From: 0.37 mi E of FM 365 Limit to: 3.22 mi East (Eastbound) Project Description : US 90 (0.37 mi E of FM 365 to 3.22 mi East)(Eastbound) FDCR / mill /inlay shld, Joint Seal, OCST, SMA-D "Prebid Q & A will be posted in 42 days & -7 hours. Please contact district with current questions." Working day type (ccsj) : Working Days Max. Maximum number of working days :81 LENGTH: 4.075 DBE GOAL: 0% GUARANTY: $100000 TXDOT - Rehabilitate Existing Roadway - US 90 Contractor questions on this project are to be addressed to the following individual(s): Name Dave Collins, P.E. Email Dave.Collins@txdot. gov Name Richard Bradley Jr., P.E. Email Richard.Bradley@txdot.gov Item 7 Legal Relations and Responsibilities Item 4 Scope of Work Item 5 Control ofthe Work General Notes Sheet A General Notes Sheet B Mixing ofmaterials, storing ofmaterials, storing of equipment, or repairing of equipment on top of concrete pavement or bridge decks will not be permitted unless specifically authorized. The Contractor will not wash out concrete within the project site. Any excess concrete placed will be removed from State Right OfWay on that day and will not be allowed to remain overnight. Station the project before commencing work. Mark the stations every 100 feet. Maintain stationing throughout the duration ofthe project. Remove the station markings at the completion ofthe project. Consider this work to be subsidiary to the various bid items ofthe contract. Remove all vegetation from pavement edges, intersections and driveways before planing or ACP operations. This work will not be paid for directly but will be subsidiary to the various bid items. It is the contractors responsibility to mark the location of all existing striping and place proposed striping back in the same location or as shown in the plans. Flammable/combustible materials must be stored at a designated location as approved. Do not store flammable/combustible materials under or adjacent to Bridge class structures. Daily removal ofthese materials will be considered incidental work. Furnish all materials, labor and incidentals required to provide for traffic across the highway and for temporary ingress and egress to private property in accordance with article 7.2.4 of the standard specifications at no additional cost to the state. Maintain ingress and egress to the adjacent property at all times. Consider this work to be subsidiary to the various bid items ofthe contract. Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address: https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page. The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up. Remove all vegetation from pavement edges, intersections and driveways before planing or ACP operations. This work will not be paid for directly but will be subsidiary to the various bid items. It is the contractors responsibility to mark the location of all existing striping and place proposed striping back in the same location or as shown in the plans. Station the project before commencing work. Mark the stations every 100 feet. Maintain stationing throughout the duration ofthe project. Remove the station markings at the completion ofthe project. Consider this work to be subsidiary to the various bid items ofthe contract
Award
Roads / Highways
$3,143,022.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
January 5, 2026
US-90, Beaumont, TX
Related To This Project
Beaumont, TX
Bid Date: Apr 07 2023
Beaumont, TX
Bid Date: Apr 13 2023
Beaumont, TX
--
Beaumont, TX
--
Beaumont, TX
--
Beaumont, TX
Bid Date: Aug 09 2023
Beaumont, TX
Bid Date: May 04 2023
Beaumont, TX
Bid Date: Jun 14 2021
Beaumont, TX
Bid Date: Feb 17 2022
Beaumont, TX
Bid Date: May 04 2023
Beaumont, TX
Bid Date: Apr 06 2023
Beaumont, TX
--
Beaumont, TX
Bid Date: Aug 25 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.