BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Northbrook, Illinois. Completed plans call for site work for a water / sewer project.

As of March 7, 2024, per owner design team and general contractor have been identified. Construction began on March 4, 2024. The Village of Northbrook requests proposals for professional construction observation services for the Dundee Road Water Main replacement project. The Village's FY 2023-24 Budget (May 1, 2023 to April 30, 2024) has allocated funding for the construction of the Dundee Road Water main Replacement Project. A brief summary of the construction work to be implemented can be found below: The 16-inch cast iron Dundee Road water main was installed in 1963. The water main is located under the railroad and West Fork of the North Branch of the Chicago River. A failure of this main could impair the Village's ability to supply water to the western portions of the community and impact traffic on a major arterial roadway and potentially commuter rail service on the Milwaukee District North Line. This main will be replaced with a 24-inch diameter pipe which will be substantially installed by directionally drilling on the south side of Dundee Road. There will also be two locations where the water main is directionally drilled across Dundee Road. The Village has acquired necessary easements from residential properties on the corridor to complete the project. Project Estimated Construction Cost: $2,320,000.00

Under Construction

Water / Sewer

$2,320,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
127
Bidding Soon
1,967
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

img_map_placeholder

Dundee Rd, Northbrook, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.