BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a mixed-use development in Vacaville, California. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; water / sewer project; and water / sewer project.

General Scope of Work: The Project includes remove existing and replace with new door operator; replace existing door guard with new scan guard light curtain; replace existing elevator controller with new controller; provide new car-top run station; replace existing car positioning with new smart car positioning system; replace all existing wiring and traveler cable with new wiring conductors and traveler cable; replace existing car fixture and hall fixture with new car fixture and hall fixture; retain existing fire alarm system and operations; and provide elevator acceptance with the State of California Division of Industrial Relations. Project scope and specifications have been prepared by County of Solano, Department of General Services. Location- 301 County Airport Road, Vacaville, CA 95866 Engineer's Estimate: $110,000 DESCRIPTION and ADDITIONAL REQUIREMENT A. Project Description: 1. Contractor shall remove and replace existing with new door operator with Gal MOVFE 2500-HL Door Operator or SGV Wittur's Smart Global Vision Door Operator or equal. 2. Contractor shall remove and replace existing door guard withe GAL ScanGuard Light Curtain or Formula System-Safescreen Light Curtain or equal. 3. Contractor shall remove and replace existing with new controller. Controller shall be SMARTRISE HYDRAULIC CONTROLLER or LYKOS HYDRAULIC CONTROLLER or equal. 4. Contractor shall provide a new SMARTRISE SMARTCONNECT car-top run station or LYKOS car-top run station or equal. 5. Contractor shall remove and replace existing car positioning with new SMARTRISE SMARTPOSITIONING landing system or ALPHA landing system or equal. 6. Contractor shall replace all existing wiring and traveler cable with new wiring conductors and traveler cable 7. Contractor shall remove and replace existing car and hall fixture with new car and hall fixture. Buttons for the fixture shall be from SCS Elevator Products or equal. 8. Contractor shall retain existing fire alarm system and operations. 9. Contractor shall provide acceptance with the State of California Division of Industrial Relations / State of California Division of Occupational Safety and Health elevator unit. 10. Contractor shall provide system interface between elevator system and all relevant controls. 11. Contractor shall test and commission the elevator system. 05-29-2023 Construction (Mobilization) Start Date 06-30-2023 Complete Submittal Review .09-20-2023 Substantial Completion .10-20-2023 Final Completion

Award

Transportation Terminals

$90,000.00

Public - County

Renovation, Site Work

9

13

15

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
89
Bidding Soon
1,816
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 29, 2023

img_map_placeholder

301 County Airport Rd, Vacaville, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.