Renovation of an educational facility in Port Loring, Ontario. Completed plans call for the renovation of a educational facility.

Mechanical: Boiler Room: 1. Remove existing oil fired heating plant boilers (2x) complete with all piping, oil fuel pump, piping, valves, headers, venting, chimney breeching, drainage piping, boiler pumps, control and other accessories. 2. Construct new propane fired hot water heating plant including new piping, condensing boilers (2), primary pumping stations, secondary pump assembles, boilers custom rack, chimney/venting system, new upgraded propane gas line distribution, control, piping insulation and jackets. 3. Paint entire concreate slab and floor after job completion - epoxy paint - grey, 2 layers. 4. Repair existing wall areas after old chimney removals, modify wall to accommodate new venting. 5. Install combustion air and ventilation air ductwork. 6. Remove existing oil fuel underground storage tank complete with piping, supports, etc. Refill hole, (void) after tank removal with native soil. Complete to match existing. 7. Provide propane gas line extension for roof to boiler room. 8. Install boiler control with remote temperature sensors. 9. Install concrete wall between existing outdoor propane fuel tanks and storage building - see structural drawings. 10. Perform any other work required by this contract. Electrical: The scope of work for this project includes: 1. Disconnect existing power supplies from existing boilers and pumps, underground oil storage tank control, remove wires up to electrical panel. 2. Re-wire new boilers and circulating pumps as shown, use existing breakers in the existing electrical panel. 3. Install electric unit heater, wire to the existing electrical panel, provide new breaker to match existing. 4. Remove existing overhead wiring to the outdoor storage building and replace with underground electrical distribution. Fire alarm devices to be tested and report to be provided. 5. Perform any other work required by this contract. Documents can be obtained at: https://nearnorthschools.bidsandtenders.ca Question Deadline: Fri Apr 14, 2023 4:00 PM (EDT) Award subject to final approval

Award

Educational

$233,900.00

Public - State/Provincial

Renovation

6

12

4

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
4
Bidding Soon
77
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

June 26, 2023

img_map_placeholder

11767 ON-522, Port Loring, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.