Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2023 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Columbia Falls, Montana. Contact the soliciting agency for additional information.
See Amendment 1 attached to Extend the Offeror Response time and additional details. Submit amendment 1 with your Offeror. Refer to the attached Solicitation/RFQ and additional attachments for details. Project: GAOA WILD AND SCENIC RIVER ACCESS SITE DEFERRED MAINTENANCE - GLACIER VIEW Flathead National Forest Glacier View Ranger District Flathead County, Montana Description of Work. The project consists of road clearing, reconditioning, drain dip installation, and re-establishing driving surface. This includes watering, mixing, blading, shaping, and compaction of processed material into a smooth nonsegregated road surface. This work will also include the installation of drain dips, as staked, suitable for recreation traffic at specified locations within the roadway. Sections of roadway identified in the plans that require roadway reconditioning shall be fully reconditioned to include, ditch, shoulders, inlets/outlets, scarification, shaping, watering and compacting in accordance with applicable specifications. Clearing of roadside brush and vegetation, including the disposal of material generated, as needed for project operations, will be allowed and shall be incidental to payment for the work being performed. Project Location. To reach the project start point from Flathead National Forest Supervisors Office, drive 16.7 miles to Columbia Falls, Montana via U. S. Highway No. 2 E, then turn left on 4th Ave. W in Columbia Falls. Continue onto 1st Ave. W N / Railroad Street. Drive 1 mile and continue onto North Fork Road. The project starting point is located on the Glacier View Ranger District, Section 35, Township 32 North, Range 20 West, PMM. Directions - Continue on North Fork Road for: 10.1 miles and turn right on NFSR 10363 for Glacier Rim River Access Site. 15.8 miles and turn right on NFSR 1070 for the Great Northern Flats River Access Site. 44.6 miles and turn right on NFSR 308 for the Ford River Access Site. Period of Performance. The estimated start date is May 22, 2023 through October 31, 2023. The contract time will run continuously from the effective notice to proceed. Contact Information: Contact the Contracting Officer (CO), Darrin Jackson by email via darrin.jackson@usda.gov if you have any questions. No site visit is planned at this time. NOTE: No site visit is scheduled at this time by the Government. If you have questions regarding access to the site or directions, contact the Contracting Officer (CO), Darrin Jackson at darrin.jackson@usda.gov or the Technical Contact: Cliff Lewis, w: 406-785-5222, Email: Clifford.Lewis@usda.gov. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Contracting Administrated and Issuing Office (1284LM): USDA FOREST SERVICE CSA INTERMOUNTAIN 2 R1, LOLO NATIONAL FOREST 24 FORT MISSOULA RD MISSOULA, MT 59804
Final Planning
Roads / Highways
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2023
December 1, 2023
Highway No. 2 E, Columbia Falls, MT
Related To This Project
Columbia Falls, MT
Bid Date: Apr 27 2023
Columbia Falls, MT
Bid Date: Jun 19 2023
Columbia Falls, MT
Bid Date: Jun 26 2023
Columbia Falls, MT
Bid Date: Jul 26 2023
Columbia Falls, MT
Bid Date: Nov 18 2021
Columbia Falls, MT
Bid Date: Jan 20 2022
Columbia Falls, MT
--
Columbia Falls, MT
Bid Date: Apr 06 2022
Columbia Falls, MT
--
Columbia Falls, MT
Bid Date: Apr 18 2023
Columbia Falls, MT
--
Columbia Falls, MT
Bid Date: Feb 15 2023
Columbia Falls, MT
Bid Date: Sep 17 2020
Columbia Falls, MT
Bid Date: Jan 20 2022
Columbia Falls, MT
Bid Date: Mar 19 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
