BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Columbia Falls, Montana. Contact the soliciting agency for additional information.

See Amendment 1 attached to Extend the Offeror Response time and additional details. Submit amendment 1 with your Offeror. Refer to the attached Solicitation/RFQ and additional attachments for details. Project: GAOA WILD AND SCENIC RIVER ACCESS SITE DEFERRED MAINTENANCE - GLACIER VIEW Flathead National Forest Glacier View Ranger District Flathead County, Montana Description of Work. The project consists of road clearing, reconditioning, drain dip installation, and re-establishing driving surface. This includes watering, mixing, blading, shaping, and compaction of processed material into a smooth nonsegregated road surface. This work will also include the installation of drain dips, as staked, suitable for recreation traffic at specified locations within the roadway. Sections of roadway identified in the plans that require roadway reconditioning shall be fully reconditioned to include, ditch, shoulders, inlets/outlets, scarification, shaping, watering and compacting in accordance with applicable specifications. Clearing of roadside brush and vegetation, including the disposal of material generated, as needed for project operations, will be allowed and shall be incidental to payment for the work being performed. Project Location. To reach the project start point from Flathead National Forest Supervisors Office, drive 16.7 miles to Columbia Falls, Montana via U. S. Highway No. 2 E, then turn left on 4th Ave. W in Columbia Falls. Continue onto 1st Ave. W N / Railroad Street. Drive 1 mile and continue onto North Fork Road. The project starting point is located on the Glacier View Ranger District, Section 35, Township 32 North, Range 20 West, PMM. Directions - Continue on North Fork Road for: 10.1 miles and turn right on NFSR 10363 for Glacier Rim River Access Site. 15.8 miles and turn right on NFSR 1070 for the Great Northern Flats River Access Site. 44.6 miles and turn right on NFSR 308 for the Ford River Access Site. Period of Performance. The estimated start date is May 22, 2023 through October 31, 2023. The contract time will run continuously from the effective notice to proceed. Contact Information: Contact the Contracting Officer (CO), Darrin Jackson by email via darrin.jackson@usda.gov if you have any questions. No site visit is planned at this time. NOTE: No site visit is scheduled at this time by the Government. If you have questions regarding access to the site or directions, contact the Contracting Officer (CO), Darrin Jackson at darrin.jackson@usda.gov or the Technical Contact: Cliff Lewis, w: 406-785-5222, Email: Clifford.Lewis@usda.gov. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Contracting Administrated and Issuing Office (1284LM): USDA FOREST SERVICE CSA INTERMOUNTAIN 2 R1, LOLO NATIONAL FOREST 24 FORT MISSOULA RD MISSOULA, MT 59804

Final Planning

Roads / Highways

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
47
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2023

December 1, 2023

img_map_placeholder

Highway No. 2 E, Columbia Falls, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.