BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a clubhouse / community center in Greenville, South Carolina. Working plans call for the renovation of a clubhouse / community center.

The City of Greenville is seeking qualifications and proposals from vendors interested and able to provide design/build services for the full turnkey renovation of an existing community center building commonly known as the Nicholtown Community Center and the associated site, which is owned by the City. Deadline for questions or clarifications: 2:00 p.m. et, april 27, 2023 1) Building Improvements: i. Full Renovation and substantial reconfiguration ofthe entire 6,048 square foot building interior for continued use as a community center. This includes all spaces: offices, kitchen, multipurpose rooms, computer lab/media room, restrooms, storage, corridors, etc. ii. Integration or building addition(s)for a new entrance and/or overall aesthetic upgrade to the facility. iii. Building Envelope upgrade, replacement, rehabilitation, and/or repair 1. The current roofing system and roofing accessories will at minimum require some repair. All repair work or modification must be completed in compliance with the existing warranty. If full or partial roof restoration is deemed necessary, the selected technique should include a 20-year manufacturer's warranty. The final executed strategy must be approved by the City. (Current roof replaced in 2014 with GAF warranty through 2034.) 2. Replacement of existing fenestration as well as installation of additional fenestration throughout. 3. Masonry evaluation and repair as necessary. iv. Building mechanical, electrical, plumbing, and Fire Protection replacement and relocation v. Environmental testing and corresponding abatement/remediation if necessary vi. Accessibility (ADA) improvements and modernization vii. Structural improvements (if and as needed) Shortlist Confirmed

Final Planning

Clubhouse / Community Centers

$1,800,000.00

Public - City

Renovation

6

13

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
730
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

January 9, 2024

img_map_placeholder

112 Rebecca St, Greenville, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.