Site work for a water / sewer project in Middletown, Connecticut. Completed plans call for site work for a water / sewer project.

Sewer rehabilitation within various sub-basins (basins 25/26 additional basins) Work required pursuant to this contract includes furnishing all labor, materials, equipment and incidentals necessary to complete the project as listed above. The project consists of the rehabilitation of wastewater pipelines, lateral service connections, and manholes for existing portions of the City's collection system using various products and technologies. The project also consists of pre- and post-rehabilitation inspections and site restoration. All work is to be completed in strict accordance with the Contract Documents. A bid bond in the amount of ten percent (10.0%) of the total bid amount shall be required with all bids submitted. Performance and Labor and Materials Payment Bond(s) in the amount of 100% of the contract sum shall be required from the selected bidder following award. A Maintenance Bond in the amount of ten percent (10%) of the contract sum shall be required after completion of work and prior to final payment. All bids shall be submitted in duplicate on the designated forms using the Bid Return Label provided as designated in the Information for Bidders by the date set and time. Bid proposals must be executed in accordance with and are subject to the instructions contained within the Information for Bidders. The three (3) apparent lowest responsible bidders' bid bond documents may be held for a period of up to ninety (90) consecutive calendar days or until a contract is signed and then all bond documents, other than those of the successful responsible bidder shall be returned. The City of Middletown reserves the right to waive any defect or any irregularity in any bid and reserves the right to reject any or all bids or any part thereof. Bids and amendments to bids received after the time set for the bid opening will not be considered. All bids must be completely filled out when submitted. No bid may be withdrawn for a period of ninety (90) days subsequent to the opening of bids without the written consent of the City of Middletown. Withdrawal of any bid must be submitted in writing to the City of Middletown. All bids and proposals are subject to, and must comply with the equal opportunity and non-discriminatory provisions set forth in the Affirmative Action Plan of the City of Middletown. To receive consideration, such questions shall be submitted in writing. Deadline for submission of questions is Friday, May 5, 2023 by Noon (EST) Every request for an interpretation shall be made in writing, addressed and forwarded to the Supervisor of Purchases, Municipal Building, 245 DeKoven Drive, Middletown, Connecticut, 06457. Questions may be sent via facsimile to (860) 638-1995 or emailed at purchase@middletownct.go A. Location: The Work locations include, but are not limited to, locations within various subbasins in the City of Middletown, CT. GIS maps are attached to this specification package. Summary of the rehabilitation work is also listed on tables on the GIS maps attached. B. Work Included: The Work includes, but is not limited to, the following: 1. Sewer System Rehabilitation: a. Sewer pipe and manhole rehabilitation including replacement, structural lining, and grout sealing as identified herein. b. Refer to the Manhole Rehabilitation Schedule and Sewer Pipe Rehabilitation Schedule for additional information. 2. Testing of sanitary sewers, and manholes for proper installation and performance. 3. Sewer Manhole Installation 4. All related site work including trench excavation, ledge excavation, groundwater dewatering, disposal of excess excavated materials, filter fabric, bedding, backfill, compaction, road/drive subbase, paving, curbing, sidewalk, loam/seed and landscaping. 5. Other miscellaneous work shown in the Specifications for a complete and operational system. Time for completion is 180 calendar days. The project area includes but is not limited to the following streets: Court Street College Street Washington Street Church Street South Main Street Warwick Street Pameacha Avenue

Award

Water / Sewer

$1,405,267.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
262
Bidding Soon
4,390
All Active Projects
1,808
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

July 24, 2023

img_map_placeholder

Multiple Locations, Middletown, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.