Site work for a civil project in Washington, Massachusetts. Completed plans call for site work for a bridge / tunnel.

As of August 8, 223, the project has been awarded. A timeline for construction has not been confirmed. The work consists of the construction of approximately 80 feet of 112 inch by 75 inch corrugated metal pipe (CMP) arch culvert across Frost Road to replace the existing 36-inch diameter culvert. Bids shall be on a Lump Sum price basis. All Bids for this project are subject to the provisions of Massachusetts General Laws Chapter 30, Section 39M as amended Prospective bidders must complete a one-time registration process on the web site in order to receive log-in credentials. Bidders must log in to the web site to download bidding documents for the project. Bidders will be added to the "planholders" or prospective bidders list upon downloading the bidding documents for the project. Bidding documents may also be examined at the office of Tighe & Bond, Inc., 53 Southampton Road, Westfield, Massachusetts between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, legal holidays excluded. A bid deposit shall be furnished in accordance with the Instructions to Bidders. The time period for holding Bids, where Federal approval is not required is 30 days, Saturdays, Sundays and legal holidays excluded, after opening of Bids and where Federal approval is required,the time period for holding Bids is 30 days, Saturdays, Sundays and holidays excluded after Federal approval. This Contract contains price adjustments for hot mix asphalt mixes, diesel fuel, gasoline, and steel. See Section 01270 for payment procedures and base prices for this Project Minimum Wage Rates as determined by the Commissioner of Department of Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the Contractor, before Bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed Work under this Contract. The Town of Washington reserves the right to accept or reject any and all bids, in whole or in part, to waive any informality in the bids received, and to accept the bid deemed to be most favorable to the best interest of the Town. The bidder agrees that its bid shall be good and not withdrawn for a period of thirty (30) days, Saturdays, Sundays, and legal holidays excluded, after the date of opening the bids. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Bridges / Tunnels

$278,086.00

Public - City

Site Work

10

11

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
167
Bidding Soon
3,109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

Project location map

Frost Rd, Washington, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.