Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Exeter, New Hampshire. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This Federally funded Transportation Alternative Program (TAP) project involves installing shoulders along both sides of Kingston Road between the Little River Bridge and Pickpocket Road (approximately 1 mile), will include improvements at Brickyard Park driveway/gravel shoulder, and enhance pedestrian crossings. Shoulder widening will involve removal of existing features and installation of sub-base, pavement, and side slopes, as well as modifying/replacing existing drainage pipes and structures, reconstructing driveways, clearing trees and vegetation (where they conflict with proposed work or restrict sight distances), erecting signage, and modifying utilities, as may be required. A 5 ft bituminous sidewalk will be installed along the southern side of Kingston Road from Tamarind Lane to the bridge over the Little River (approximately 3,000 ft). The sidewalk will be separated from the road by a 5 ft grass panel, with some panels containing a Bio Retention Swale.

Bid Results

Bridges / Tunnels

$1,589,205.00

Public - City

Paving, Site Work

44

9

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
612
Active Projects
320
Bidding Soon
4,122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2023

December 15, 2023

Project location map

Kingston Rd, Exeter, NH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed