BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and new construction of an educational facility in Fife, Washington. Conceptual plans call for the demolition of a educational facility; and for the construction of a 205,000-square-foot educational facility.

As of August 14, 2024, this project is on hold. A timeline for construction has not been established. Previous solicitation listed below: Fife Public Schools anticipates initiating predesign, including validation/development of existing preliminary educational specifications, and schematic design phase work with one architectural firm in May/June 2023 in advance of a November 2023 General Election Capital Bond Measure that will fund the remaining design phases and development of the new high school. The project consists of a new high school of approximately 205,000 GSF integrated with a 30,000 GSF STEAM Center that opened in January 2023. The new 9-12 grade high school will be constructed directly adjacent to the existing Fife High School. The project will include the development of new football and track and field facilities including stadium seating, demolition of the existing high school facilities, and significant on-site landscape, pedestrian, surface transportation, and storm water management infrastructure improvements. The existing 10-12 grade high school will remain fully occupied and operational during the project's construction phases. The new high school is intended to serve approximately 1,300 students in grades 9-12. The project is expected to participate in the OSPI School Construction Assistance Program. The district also intends to submit an application to CPARB's Project Review Committee forsummer 2023 review requesting the use of the General Contractor/Construction Manager method of alternative project delivery. Outstanding and comprehensive design, bid/award, construction administration, and project closeout services including record documentation are required by selected the architectural firm and will include structural, mechanical, electrical, and civil engineering services, landscape architectural services, interior design services consistent with Fife guidelines, specialty sports field services, cost planning services, environmental graphics services, energy modeling/analysis services, cafeteria and kitchen services; as well as integrated information technology services, building controls and security systems services. In addition, it is a requirement of the project to ensure new facilities allow for equitable access to education; maximize efficiency in functional and effective utilization of each designed interior and exterior space, support the Fife Public Schools owner project requirements, and are physical design solutions that will enhance the Fife Public Schools strong educational vision and mission for our students, teachers, staff, families, and all of the communities we serve now and into the near future. Selection Committee questions may be asked of submitting firms via e-mail or phone during the selection committee review process. Interviews ofshort-listed firms are expected to take place on or around April 27, 2023. The District intends to enter into a negotiation for a consulting agreement with the firm offering the best qualifications and experience as judged by the Fife Public Schools Selection Committee. Fife Public Schools anticipates the award of the work in early May 2023. Firms are requested to limit District outreach and communications during the solicitation period by contacting Jennifer Halleck via email at jennifer.halleck@esd112.org with all inquiries.

Conceptual

Educational

$60,000,000.00

Public - City

Demolition, New Construction

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
72
Bidding Soon
1,984
All Active Projects
585
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 1, 2025

img_map_placeholder

5616 20th St E, Fife, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.