BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Graford, Texas. Completed plans call for site work for a water / sewer project.

Any difficulty, contact Allison Sheeler at allison.sheeler@brazos.org or at 254-761-3153. The owner reserves the right to accept any of the Bids submitted or to reject any or all Bids and to waive informalities and irregularities in the Bids. Question Deadline 05/04/2023 Any questions concerning this Bid should be emailed to Allison Sheeler, Purchasing Agent, no later than five (5) days prior to the opening of the Bid at submissions@brazos.org The BRA owns and operates Morris Sheppard Dam, which forms Possum Kingdom Reservoir ("PK"), which is a water supply reservoir, and is located in Palo Pinto County approximately 25 miles northwest of Mineral Wells, Texas. Morris Sheppard Dam was constructed in 1941 and consists of an Ambursen flat-slab and buttress dam structure with a service spillway, earthen embankment section, emergency spillway, intake structure in addition to a 78 inch and 42 inch controlled outlet conduit. The service spillway section consists of nine bear-trap (roof weir) gates that pass floodwater downstream. Under normal conditions, the spillway gates are hydraulically operated by reservoir head. Reservoir water is allowed to flow into the gate chamber beneath the gate, making it buoyant, then the gate leaves are unlatched and lowered to release the water. To assist with gate operations during low reservoir conditions (i.e., elevation 995 and below), a spillway pump and piping system was utilized to supply pressurized water into the underside of the gates to assist in lowering and raising the gates. Due to modifications to the spillway piping in the dam (as part of a previous project), the spillway pump and piping system was disconnected. The spillway pump and piping system also provides water for the Texas Parks and Wildlife Department (TPWD) fish hatchery, which is located adjacent to Morris Sheppard Dam. It will be the responsibility of the CONTRACTOR to coordinate with the ENGINEER so that disruptions in service to the fish hatchery are planned with TPWD in a way that will minimize impacts to their operation. General description of Project: Upgrade the spillway pump and piping system to operate the nine bear trap gates during low reservoir conditions. In addition, the piping system will be utilized to gravity flow both cold and warm water to the fish hatchery when not being used for gate operations. System includes a new horizontal split case pump and motor, replacement of all piping as outlined in the plans, both in and outside of the pump room required for operation of the pumped system for the gates and the gravity warm and cold-water system for the fish hatchery. Location: Morris Sheppard Dam is located on the southeast corner of Possum Kingdom Lake. The work will be completed in the pump room area, down the walkway inside of the dam structure, some work to be completed in the areas of Bays 4, 5, 6, and 7, and also in the parking area from where the pipe leaves the structure, through the fenced high voltage area to make the conversion of above ground steel to below ground PVC and connect to the existing PVC pipeline in a safe distance into the parking area as marked.

Post-Bid

Water / Sewer

$2,000,000.00

Public - State/Provincial

Site Work

21

24

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
91
Bidding Soon
2,187
All Active Projects
819
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 9, 2023

July 10, 2023

November 13, 2024

img_map_placeholder

301 Observation Point Rd, Graford, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.