BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Duluth, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of 05/04/2023 This will go to Council for approval on May 8th. Reconstruction of 1 st Avenue East - East Superior Street to East 3 rd Street, including grading, aggregate base, concrete pavement, bituminous pavement, ADA improvements, sidewalk, curb & gutter, signals, retaining wall, storm sewer, water main, hot water, and utilities. More information can be found at website. If bid bonds are emailed, bidders should be aware that the City's spam filter may prevent receipt of the email. It is the bidder's responsibility to verify emailed bid bonds have been received by Purchasing. Regardless of the method of submission, bid surety must be received by Purchasing prior to the bid opening. Not less than prevailing wages as included in the specifications and provisions must be paid on this project. A Project Labor Agreement (PLA) and Community Benefits provisions will be required for any bid that is over or could virtually go over $150,000. The contractor must take affirmative action to ensure that the employees and applicants for employment are not discriminated against because of their race, color, creed, sex or national origin, and must meet the affirmative action goals. Contractors are encouraged to subcontract with Disadvantaged Business Enterprises when possible. Contractor will comply with all applicable Equal Employment Opportunity laws and regulations. The City of Duluth reserves the right to waive informalities and to reject any or all bids. Questions pertaining to this project should be directed to: Alex Popp, Project Engineer by email at apopp@duluthmn.gov or by phone at (218) 730-5087. The project consists of the full reconstruction of 1st Avenue East in downtown Duluth. Work includes full-depth pavement reconstruction; concrete walks; concrete curb and gutter; concrete ADA pedestrian ramps; and concrete retaining walls. Project utility work includes water main and services; hot watersupply and return mains and services;sanitary sewerservice laterals; steam mains; storm sewer; and roof drain leaders.

Award

Roads / Highways

$5,635,100.00

Public - City

Paving, Site Work

176

19

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
13
Bidding Soon
112
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

May 1, 2023

img_map_placeholder

411 W 1st St, Duluth, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.