Published May 5, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in East Ellijay, Georgia. Completed plans call for site work for a water / sewer project.

Sealed Bids for all material, labor and equipment for the "SR5/SR382 Water System Improvements". This includes approximately 12,595 L.F. of 12", 8" & 6" PC 350 DIP Water Main Replacement with all related accessories as shown on the plans and called for in the Contract Documents and Technical Specifications. Bids shall be based on Unit Price Items. The project shall be Substantially Complete within 180 calendar days from the date of notice to proceed of the contract.Each BIDDER must deposit with his bid, security in the amount of 10%, and shall be subject to the conditions provided in Section 00200 "INSTRUCTION TO BIDDERS." No BIDDER may withdraw his bid within sixty (60) days after the date of Bid opening. Each Bidder is required to submit a "Bid form", "Bid Bond", "Form of Qualification of Bidder", "Non-Collusion Affidavit" and "Immigration and Security Form" as outlined in Section 00250. This contract is Local funded. The Ellijay-Gilmer County Water & Sewerage Authority reserves the right to waive any informalities or irregularities, or to reject any or all bids and to readvertise. Every request for such interpretation should be made in writing and addressed to Goodwyn Mills Cawood, LLC 6120 Powers Ferry Rd NW, Suite 200, Atlanta, Georgia 30339 (Attn: David Smith); Phone (770) 952-2481; e-mail at "david.smith@gmcnetwork.com" and to be given consideration, must be received at least five (5) business days prior to the date fixed for opening Bids

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Site Work

19

14

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
97
Bidding Soon
1,448
All Active Projects
609
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

July 3, 2023

img_map_placeholder

Multiple Locations, East Ellijay, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.