EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Carpentersville, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 29, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The proposed improvements will consist HMA mill and resurface, sidewalk and carriage walk removal, placement of concrete sidewalk and curb & gutter, structure adjustments and reconstructs, Class D patching, pavement markings, restoration and all other ancillary work required to complete the project in accordance with the plans, specifications and all other applicable standards. A Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total proposal shall be submitted with each proposal as provided in Article of the Standard Specifications for Road and Bridge Construction, prepared by the Illinois Department of Transportation. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. This contracting opportunity has been made possible, in part, by the Kane County Board, through its Office of Community Reinvestment, with federal funds provided by the U.S. Department of Housing and Urban Development. Section 3 Businesses and Minority/Women-Owned Businesses are encouraged to bid on this project. Federal prevailing wage requirements apply to this contract. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as provided in Article 102.08 of the Standard Specifications for Road and Bridge Construction prepared by the Illinois Department of Transportation. The Village of Carpentersville is an equal opportunity employer. complete the work within 40 working day

Bid Results

Roads / Highways

$553,894.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
154
Bidding Soon
2,477
All Active Projects
911
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

September 25, 2023

img_map_placeholder

Multiple Locations, Carpentersville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.