BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work and new construction of a water / sewer project in Burlington Township, New Jersey. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of 5/28/25 all bids rejected. A timeline for the rebid has not yet been established. All solicitations are subject to change. Bidders are advised to check the County's eProcurement system periodically for any future addenda, revisions, etc. prior to the opening date. The Division of Purchasing's public office hours are Monday through Friday from 9:00 A.M. to 4:00 P.M. EST, County holidays excluded. Question Deadline 04/21/2025 at 10:00 AM ET The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans. The major items for construction include, but are not limited to: 1. Design and Construction of a Design-Build-Operate Wastewater Treatment System for the effluent at the Resource Recovery Complex. Work includes, but is not limited to, the following: a. Select demolition on site and within existing County building as per the plan details and as required by the bidder to install the necessary treatment equipment. b. Installation of new tankage, pumping equipment, valves, piping, electrical, instrumentation, chemical feed equipment and accessories to meet the System Design Effluent Parameters and as required by the bidder to install the necessary effluent treatment equipment. c. A service agreement with the Contractor to provide operation services in accordance with the terms included in the specifications. d. The Contractor is responsible to provide licensed operations with a minimum classification of N2 throughout the operations and as required within the service agreement. e. The County has been in the process of renewal/modification of the NJPDES permit for the operation of a new wastewater treatment system at the Resource Recovery Complex and to increase the permitted discharge flow from 0.07 mgd to 0.13 mgd. A copy of the final NJPDES permit will be issued to the Contractor upon receipt by the County.

Final Planning

Water / Sewer

$5,000,000.00

Public - County

New Construction, Site Work

12

19

77

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
917
Active Projects
473
Bidding Soon
7,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

July 7, 2025

Project location map

87 Recycle Rd, Burlington Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.