Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Berkeley, California. Conceptual plans call for the renovation of a educational facility.
Qualification Documents will be available on April 4, 2023 at 5:00 PM. Project numbers 12828A is the Dwinelle Hall project, 12829A is the McCone Hall project and 12872A is the Gilman Hall project. This design RFQ is considered a packaged issuance because of the design readiness to compile a permit package and common scope of work synergies, being a MEP application. o The MEP engineers will validate the existing conditions before engineering begins, specifically, but not limited to, ductwork arrangements, power distribution, equipment modifications vs. MEP equipment schedules, fans, building automation infrastructure and associated control logic. o While Deferred Maintenance (DM) scope is focused as "replaced in kind", the Engineer of Record (EOR) will validate the building HVAC load profile vs. existing air and hydronics distribution to ensure the associated equipment is right-sized from an energy perspective. If required, additional test and balance (TAB) surveys shall be conducted to verify the air and water flows, temperatures and pressure relationships. o A basis of design (BOD) shall be drafted and issued to confirm the design criteria, engineering scope boundaries, design assumptions and stakeholder confirmations. o Given the scale of the project, three (3) engineering packages shall be issued for schematic design (BOD), design development and permit package / CD sets. Given the Deferred Maintenance (DM) UCOP deadlines, these projects shall start simultaneously and the selected engineering firm must have the available manpower to complete (3) projects concurrently and maintain the design schedule. o The Preliminary Design Schedules is as follows: SB/BOD - 4 weeks DD - 8 weeks CD - 8 weeks o Meet with Berkeley Campus stakeholders, such as Facilities Services Personnel, Energy Office, EMS / Controls, Campus Fire Marshal and Building Managers, to determine known issues with the building HVAC systems and related controls. o MEP assessment and respective reports are enclosed as RFQ exhibits. Therefore, additional surveys, etc. are considered non-applicable. These MEP assessment reports are considered approved by the stakeholders to determine Day 1 vs. Day 2" scope of work, using Target Value Design (TVD) principles. o The Gilman Hall engineering charter is building cooling systems. A MEP study wasn't required for this facility. o Associated with this request for qualifications are links to the following documents that contain background materials for the project: o McCone Hall Final Report o Dwinelle Hall Report Questions about this RFQ or the project should be submitted using Building Connected by using the 'Message' Tab no later than 3:00 PM PST on April 18, 2023. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Educational
$4,000,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2024
Multiple Locations, Berkeley, CA
Related To This Project
Berkeley, CA
Bid Date: May 05 2023
Berkeley, CA
Bid Date: Aug 08 2023
Berkeley, CA
Bid Date: May 03 2023
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
Bid Date: Apr 14 2023
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
Bid Date: Mar 24 2023
Berkeley, CA
Bid Date: May 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.