BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Windsor, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Questions concerning this Request for Proposal should be submitted to Jason Price, Facilities Supervisor by email at jprice@windsorgov.com. All questions must be submitted by 12:00pm (MST) April 10, 2023 The Community Recreation Center is looking to install a sidewalk snow melt system at the front entrance, East employee entrance, as well as the North employee entrance. This will help with our snow removal operations throughout the winter months. We would like for Electrical companies to work with Concrete Companies in scheduling and completion of this project. We must complete the main entrance sidewalk snow melt system during the week the Community Recreation Center shutdown week, August 21-25th 2023. 2.2Scope The service provider will be responsible for the following: Provide necessary permits. Provide all parts, labor, preparations and clean up to complete scope of work. Adhere to all safety protocols during the duration of the install. Provide personal protective equipment and all necessary tools. Demo original sidewalk, remove, and dispose of all debris, form up for new sidewalk, then once electricians install electric snow melt system, pour new concrete and finish. The measurements are approximately 10'x 80' section of the front entrance sidewalk, extending from the front doors to the curb. Option Add approximately an additional 9'x 125' section of sidewalk that will extend from the main section to the west to include the handicap parking spaces. This option is only valid if the Main Entrance project is selected and performed at the same time as one project. East Entrance Demo original sidewalk, remove, and dispose of all debris, form up for new sidewalk, then once electricians install electric snow melt system, pour new concrete and finish. Measurements are approximately 8'x 92' section of the east entrance sidewalk, extending from the doors to the curb. North Entrance Demo original sidewalk, remove, and dispose of all debris, form up for new sidewalk, then once electricians install electric snow melt system, pour new concrete and finish. Measurements are approximately 22' x 9' and 32' x 5'

Post-Bid

Sidewalks / Parking Lot

$35,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
46
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.