Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a power facility in Washburn, Wisconsin. Completed plans call for the renovation of a power facility.

Bayfield County Wisconsin is accepting proposals for Battery Energy Storage System Installation and Integration with Solar Photovoltaic System, Natural Gas Generator Integration, Electric Vehicle Supply Equipment Installation, and Controls. This projected funded by the Public Service Commission of Wisconsin, Office of Energy Innovation and the Department of Energy, Office of Energy Efficiency and Renewable Energy (EERE), under the State Energy Program Award Number DE-EE0000163. Installing the 60 kW / 100 kWh BESS. This system will comprise two 30 kW SolArk inverters, model 30k-3p-208, along with 4 battery storage stacks of ~24 kWh each at the Bayfield County Main Highway garage in Washburn in the electrical room, aka "Old Boiler Room" (see engineering plan). Integrating the BESS with the existing solar PV and generator to form a microgrid when disconnected from the grid using the existing Automatic Transfer Switch (ATS). The BESS and inverters are being procured and paid by the County. . Procure and install one 80A JuiceBox EVSE unit and install one Ford Pro Charger EVSE (procured by the county) on the garage existing service. . Installing all needed balance of system components including communications and non-utility metering

Award

Power Plant

$174,950.00

Public - County

Renovation

16

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
10
Bidding Soon
281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

June 5, 2023

Project location map

311 1st Ave E, Washburn, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed