BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2023 at 8:00 PM

Updated March 27, 2025

Site work, paving and new construction of a mixed-use development in Oak Ridge North, Texas. Completed plans call for site work for a municipal facility; for the construction of a 23,669-square-foot, one-story above grade municipal facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The scope of work is defined by the Contract Documents and includes the construction for a new PEMB Maintenace Facility and surrounding site work. The 23,669 SF facility includes 17,492 SF of shop space and 2,608 SF of interior office space, with the remaining SF being exterior canopy for covered work areas. The site work includes the construction of a new driveway, parking lots, pad for temporary building, fuel island and fenced yard space.

Post-Bid

Municipal

$11,700,000.00

Public - City

New Construction, Paving, Site Work

93

23

4

5

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
5
Bidding Soon
2,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

July 10, 2023

Project location map

27375 Spectrum Way, Oak Ridge North, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.