Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Hancock, Vermont. Completed plans call for site work for a road / highway.
The Town of Hancock, Vermont is seeking construction bids for ditch cleaning, shaping and lining on Churchville Road in Hancock, Vermont Location: The worksite is located approximately 1100 feet east on Churchville Rd. from the intersection of Churchville Rd. and Route 100. The area to receive ditch work is on the right (south) side and is marked at each end with stakes with marking tape. The total distance to receive ditch work is approximately 580 linear feet. Materials: 1) 7" Erosion Stone (Quantities to be determined by contractor based on drawing provided by the Town of Hancock) 2) 1 1/2 " Clean Stone NO FINES (Quantities to be determined by Contractor based on drawings provided by the Town of Hancock) 3) Filter Fabric to line all ditch work. 4) The Town of Hancock requires that all bare ground including any areas provided for the waste materials from the ditch cleaning be hydroseeded or seeded and mulched with a Contractor's Mix. All bare ground must be covered post construction. Description of Work: Ditch Work: A. Contractor will clean and shape the ditch area. At a minimum, the Town of Hancock requires the base width to be 2'. The depth of the ditch should be 4' at the center line with the base of the Churchville Road as a completion height. Exceptions to these requirements will be considered by the Road Commissioner in the event that ledge is encountered. All stone must be 6" below the edge of Churchville Road. See Diagram on last page. It will be the Contractor's responsibility to remove all excess materials generated from this project. B. Once the ditch has been cleaned and shaped the Contractor will place filter fabric and then the 1 1/2 " clean stone in the ditch, keeping the clean stone 6" below the side of the road. The bank side will have the same clean stone height requirement. C. The seven inch ditch stone to a minimum depth of 4' across the base width then stoning the side slopes of the ditch to the required height D. Any existing bank retaining stones to be reset as needed. Any exposed bank soils not covered with retaining stones must be covered as stated above. This project will be overseen by the Hancock Road Commissioner all inquiries are to be directed to the Road Commissioner (Dan Perera 802-767-4851). If, for some reason, the Road Commissioner is unavailable, you may direct your question to the Hancock Select Board Chair (Monica Collins 802-767-3570). The Town of Hancock Reserves the Right to Reject Any and All Bids. Insurance Requirements: The Town of Hancock requires that all Contractors or Persons working for the Town of Hancock carry a General liability Policy of no less than One million Dollars ($1,000,000.00) with the Town of Hancock being an additional Insured. Any Contractor or Persons working for the Town of Hancock having Employees must provide the Town of Hancock with a Certificate of Worker's Compensation meeting all State of Vermont and Federal Statues. All Insurance Certificates must be on file with the Hancock Town Clerk before work is to begin.
Post-Bid
Roads / Highways
$350,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
July 6, 2023
Churchville Rd, Hancock, VT
Related To This Project
Hancock, VT
Bid Date: May 28 2024
Hancock, VT
Bid Date: Aug 15 2023
Hancock, VT
Bid Date: May 07 2024
Hancock, VT
Bid Date: Jun 04 2024
Hancock, VT
Bid Date: Jun 18 2024
Hancock, VT
Bid Date: Dec 03 2024
Hancock, VT
Bid Date: Aug 16 2022
Hancock, VT
Bid Date: Aug 16 2022
Rutland, VT
Bid Date: Apr 21 2023
Panton, VT
Bid Date: Apr 20 2023
Middlebury, VT
Bid Date: Apr 17 2023
Vergennes, VT
--
Essex Jct, VT
--
West Rutland, VT
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.