BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Mateo, California. Completed plans call for the renovation of a educational facility.

To bid on this Project, the Bidder is required to have been prequalified by the District. To bid on this Project, the Bidder is required to have been prequalified by the District. Pre-qualification for all bidding General Contractors and Sub-Contractors is to be through Quality Bidders at website In addition, if the Project has flooring, electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification (s), C-4, C-7, C-10, C-15, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46. then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District, through Quality Bidders at website Prior to the bid, a minimum of five days before bids are received the District will issue by Bid Addendum all SubContractors pre-qualified through Quality Bidders. All pre-qualification questionnaires will be received until 4:00 P.M., April 14th, 2023, through Quality Bidders using their web link at website - For this project you must COMPLETE THE PREQUALIFICATION APPLICATION - NOT THE CUPCCAA LIST. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. 5. The project consists of the following scope of work as indicated: Bid Package #1 - SMFCSD Bid - George Hall ELEMENTARY SCHOOL As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: Abatement of areas as required (See report - Scope description) Demo and remove the existing carpet, VCT/LVT and wall base Furnish and Install specified moisture barrier system and provide proper floor preparation for all existing concrete subfloor areas receiving new flooring Furnish and Install new specified entry walk off carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories. All participants are required to sign upon arrival. The site visits are expected to last approximately two (2) hours. Failure to attend or tardiness will render the bid ineligible. Bidding contractors/subcontractors are required to attend only one (1) pre-bid conference of the three offered. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Request for Information (RFI's) and Bid period questions relative to the building projects are to be submitted to Billy Tran, SMFCSD Staff, btran@smfcsd.net

Award

Educational

$210,624.00

Public - County

Renovation

4

11

43

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
170
Bidding Soon
3,072
All Active Projects
1,271
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 19, 2023

June 19, 2023

img_map_placeholder

130 San Miguel Way, San Mateo, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.