Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Oak Ridge, Tennessee. Contact the soliciting agency for additional information.
Project: Construction Electrical Services Basic Order Agreement (BOA) at Y-12 National Security Complex, Oak Ridge, Tennessee Introduction: Consolidated Nuclear Security, LLC, (CNS) is seeking interested parties to contract for the Construction Electrical Services Basic Order Agreement (BOA). The BOA is a multiyear agreement with base and optional periods. Multiple technically qualified licensed electrical contractors will be selected as BOA holders. CNS will schedule an informational meeting via Web-ex to share further details, exchange information and answer questions. All interested parties are encouraged to participate in the informational meeting. CNS will use the information obtained from this Expression of Interest and the informational meeting to structure a Request for Proposal (RFP). Background: The Y-12 National Security Complex is located in Oak Ridge, Tennessee. It is a Department of Energy (DOE) National Nuclear Security Administration (NNSA) national security complex managed and operated by CNS. The Y-12 Complex is an aging facility, first constructed in the mid-20th century. Low, medium, and high voltage electrical systems, data and control systems are in need of upgrades, repairs, replacements and/or refurbishments and testing. General Scope: Description for Construction Electrical Services BOA. The Company (Consolidated Nuclear Security, LLC, CNS) will issue and award Task Releases as authorization to perform work under the BOA. The Company-issued Task Release (TR) will contain the statement of work, appropriate technical specification(s) and/or drawing(s), and characterization data for the work to be performed. A Task Release will consist primarily of electrical, instrumentation, and communication work but may include but not be limited to supporting work, such as civil/structural, architectural, and mechanical work. In addition, work may have some deactivation/decontamination, demolition and temporary power and other general site services including escort services for un-cleared workers. Task Releases for design/build services may also be issued. All electrical work performed shall require an electrical inspection by company electrical inspector or seller certified designee inspector and approved by the site electrical contractor authority having jurisdiction (ECAHJ). The labor determination for the individual Task Releases or work activity within a Task Release could be ruled either Wage Rate Requirement (Construction)/Davis Bacon covered work or non-covered Service Contract work. Seller shall be capable of performing both non-covered Service Contract and Wage Rate Requirement (Construction)/Davis-Bacon covered work. Work scope may require the Seller to furnish Q-cleared personnel to perform or escort the work. The Seller shall provide evidence to the Company of a favorable Foreign Ownership, Control, or Influence (FOCI) determination for its company prior to employing or subcontracting for Q-cleared personnel. Seller(s) not in possession of a FOCI at time of the BOA award shall submit and obtain a favorable FOCI determination. Seller(s) unable to obtain a favorable FOCI determination within six (6) months of the BOA award, are subject to BOA termination by the Company for non-conformance. More information on this procurement, meetings, and informational sessions will be forthcoming. If you are interested in participating, provide your company's general qualifications, related experience and your envisioned role by 05/01/2023 COB to Megan Howard, megan.howard@pxy12.doe.gov or 423-741-9492. The method of contractor selection has not been determined at this time.
Conceptual
Municipal
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
301 Bear Creek Rd, Oak Ridge, TN
Related To This Project
Oak Ridge, TN
Bid Date: May 03 2023
Oak Ridge, TN
Bid Date: May 23 2023
Oak Ridge, TN
--
Oak Ridge, TN
Bid Date: Jun 15 2023
Oak Ridge, TN
Bid Date: Jun 20 2023
Oak Ridge, TN
Bid Date: Jun 09 2023
Oak Ridge, TN
Bid Date: Jun 02 2023
Oak Ridge, TN
Bid Date: May 31 2023
Oak Ridge, TN
Bid Date: May 19 2023
Oak Ridge, TN
--
Oak Ridge, TN
Bid Date: Apr 11 2023
Oak Ridge, TN
Bid Date: Mar 27 2023
Oak Ridge, TN
Bid Date: Apr 11 2023
Oak Ridge, TN
Bid Date: Apr 11 2023
Oak Ridge, TN
Bid Date: Mar 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.