Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2023 at 8:00 PM
Updated October 1, 2024
Site work for a mixed-use development in Friday Harbor, Washington. Completed plans call for site work for a transportation facility; and water / sewer project.
As ofJune 9,2023, project was awarded to PNW Civil Inc, awarded amount is $701,643.46. Port of Friday Harbor is seeking a qualified contractor to construct the Runway 16-34 Drainage Improvements project at the Friday Harbor Airport. Elements of work for this project include, but are not limited to, approximately 8,000 linear feet of new pavement underdrain and outlet pipe, new access structures and connections to existing drainage infrastructure, demolition of existing drainage infrastructure and hydroseeding. Drawings and specification files are posted on the Precision Approach Engineerings website, with the drawings viewable free of charge. E Addendums to the bid package will be issued through the online plan holders list; therefore, all prime bidders shall be responsible for downloading the bid documents in order to be included on the Plan Holders List. It is imperative that those who download the solicitation documents check the https://www.preapp inc.com /Bid Documents regularly for addenda, clarifications, and other notifications that may be pertinent, as well as the Supplier List of Interested Parties. A Drawings and Specifications may be examined at The Port of Friday Harbor or at the Engineers office, Precision Approach Engineering, Inc., 119 Grand Avenue, Suite B, Bellingham, WA 98225 (360) 733-1567. All Bid documents shall be submitted in hard copy. Electronic or e-mailed submissions shall be rejected. This contract is for a public works project subject to the Washington State Department of Labor and Industries (RCW 39.12) and the Davis-Bacon Act (40 U.S.C. 3141, et seq). The Bidder must agree that the requirements and conditions of employment be observed and minimum wage rates, as established by the U.S. Secretary of Labor, or the Washington State Department of Labor and Industries, including any appropriate amendments. The contractor shall pay the state or federal prevailing wage rate, whichever is higher, and adhere to the most stringent requirements under this contract. The PORT OF FRIDAY HARBOR has a DBE contract goal of 3.6% in compliance with their 49 CFR Part 26 program. No bid for a construction contract shall be received or considered by the PORT OF FRIDAY HARBOR unless the Bidder is registered with the Washington State Department of Licensing, as required by RCW 18.27. Potential bidders are strongly encouraged to attend the videoconference, which can be accessed at: Zoom link: https://us02we b.zoom.us/j/81505204056pwd=ejVId0h MSWp5U0NWajZ2b WtEa2M2Zz09; Meeting ID: 815 0520 4056; Passcode: 437388 OR via Dial-in: (253) 215-8782, Meeting ID: 815 0520 4056; Passcode: 437388 . For information concerning the proposed work, contact Corley McFarland at Precision Approach Engineering, Inc., telephone (541)740-0289 Dated this 10th day of April 2023. DBE contract goal of 3.6%
Award
Water / Sewer
$701,643.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2023
August 25, 2023
800 Franklin Rd, Friday Harbor, WA
Related To This Project
Friday Harbor, WA
--
Friday Harbor, WA
--
Friday Harbor, WA
Bid Date: Jun 28 2023
Friday Harbor, WA
Bid Date: Aug 22 2023
Friday Harbor, WA
Bid Date: Aug 24 2023
Friday Harbor, WA
--
Friday Harbor, WA
Bid Date: Jan 27 2022
Friday Harbor, WA
--
Friday Harbor, WA
Bid Date: May 02 2023
Friday Harbor, WA
Bid Date: Apr 24 2023
Friday Harbor, WA
--
Friday Harbor, WA
Bid Date: Mar 22 2023
Friday Harbor, WA
Bid Date: Apr 13 2023
Friday Harbor, WA
Bid Date: Feb 28 2023
Friday Harbor, WA
Bid Date: Jan 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.