BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waukegan, Illinois. Conceptual plans call for site work for a water / sewer project.

Provide emergency electrical power for the Station and for two booster pump motors from a new natural gas fueled generator. Beechnut Station is currently not provided with standby electrical power equipment. In the event of a power failure in the area affecting the Station, the existing four booster pump motors would be inoperable. Beechnut Station serves City water customers in the west central portion of the City, as well as all customers served by the Fountain Square Booster Station that serves the City’s southwestern area. Station to be retrofitted to obtain electrical power from a new permanent generator. Furnish and install new natural gas-fueled generator. Generator to be sized to provide standby power to operate two 125 hp pump motors (Pumps 1, 2 or 3). Connect new generator electrical equipment to Station automatic transfer switch. When completed, Beechnut Station will be able to operate up to two 2,000 gpm pump using standby power to operate the pumps’ 125 hp electric motors. The automatic transfer switch will function to allow power to be provided to the station from the new permanent standby power generator serve the Beechnut Station. Lead times for delivery of electrical generators are currently 12 to 18 months. As of April 18, 2023, this project is included in the City's Fiscal Year 2022-2027 CIP. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$725,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
99
Bidding Soon
2,003
All Active Projects
862
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2023

img_map_placeholder

To Be Determined, Waukegan, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.