BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Boscobel, Wisconsin. Completed plans call for the renovation of a detention facility; and pipeline.

In general, the work consists of: Replace all old undersized, compromised / leaking original 160 deg F hot water supply and return piping for the laundry operations at WSPF. The supply/return lines that are currently routed above the ceiling of the Main Kitchen and Laundry areas then proceeds up to the maintenance mezzanine to the hot water tank storage all needs to be replaced. This work will also include the relocation of the existing circulating pump

Bid Results

Pipeline

$223,225.00

Public - State/Provincial

Renovation

8

13

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
45
Bidding Soon
819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

Project location map

1101 Morrison Dr, Boscobel, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.