BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2024 at 7:00 PM

Updated January 27, 2024

Demolition, site work and new construction of a civil project in Bedford, Texas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of January 17, 2024, the project has been awarded, however, a timeline for construction has not been confirmed. 3301040-032 Demolition of two existing pump stations; One new pump station and electrical building; Five (5) vertical turbine pumps (25 MGD/pump) on variable frequency drives; Rehabilitation of two 5 MG ground storage tanks; Yard piping (20" - 72"); and Backup power generation. Completion- 800 Calendar days. 1. Demolition of two existing pump station buildings and appurtenant items 2. One new pump station building and one new electrical building 3. Five vertical turbine pumping units (25 MGD per pump) with variable frequency drives 4. Rehabilitation of two 5 MG ground storage tanks 5. Potable water yard piping, valves, and connections (20" - 60") 6. Paving, drainage, and fencing improvements 7. Addition of Chemical bulk tank 8. Storm drain relocation 9. New power feeds, electrical, and instrumentation The deadline to ask questions is 6/21/2023 11:00 PM CST

Award

Water / Sewer

$67,197,813.00

Public - State/Provincial

Demolition, New Construction, Site Work

338

75

48

Subscribe For Documents

206 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
178
Bidding Soon
3,720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2023

July 12, 2023

Project location map

Murphy Dr, Bedford, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.